China Yx40.8-81 Roll Forming Machine for Top Hat, Find details about China Cold Roll Mills, Metal Rolling from Yx40.8-81 Roll Forming Machine for Top Hat
1) The general machine parameter | |
Suitable roll forming material | Color steel sheet or galvanized steel sheet |
Thickness | 0.5-0.7mm |
Feeding width | 101mm |
Frame design | Wall-plate-frame-design /Strong-stand-frame-design |
Roll stages | 16 stages |
Material of forming roller | 45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter | Φ75mm |
Main motor power | 5.5KW with reducer |
Max. Line speed of roll former | 15m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power | 4KW |
Material of cutting blade | Cr12, heat treatment |
Electric Standard | 380V /50Hz/3PH or as the customer's requirements |
Machine Dimensions | 6400mm×1200mm×1680mm |
Major Color of Machine Painted | RAL 5015 (Blue) or as per customer's requirements |
(2) PLC Control system | |
PLC | Siemens brand (ABB brand is available if required) |
Touch Screen | Siemens brand (ABB brand is available if required) |
Inverter | Schneider brand (ABB brand is available if required) |
Encoder | Omron brand |
(3) Product rack | |
Description | un-powered, 4 meters length |
(4) Option: CE certificate Please refer to the attached pictures for details | |
(5) Service after sell | |
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. |
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.