Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile

China Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile, Find details about China Displacement Cfa Auger, CMC Auger from Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile

Model NO.
FDP displacement auger
Thickness of Spiral
30mm
Pitch
280-600mm
Joint
Hexagnal Joint or Kelly Box
Trademark
KIMDRILL
Transport Package
Pallet
Specification
Dia 300mm-1000mm
Origin
China
HS Code
8431432000
Model NO.
FDP displacement auger
Thickness of Spiral
30mm
Pitch
280-600mm
Joint
Hexagnal Joint or Kelly Box
Trademark
KIMDRILL
Transport Package
Pallet
Specification
Dia 300mm-1000mm
Origin
China
HS Code
8431432000
 Displacement CFA auger

Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile


Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile

Full Displacement Piling System

Soil displacement piles are bored cast in-situ concrete piles constructed advancing a displacement boring tools into the ground with  a rotary piling rig using both torque and crowd force. 

The system has been especially designed to limit ground liquefaction potential and total different settlement. It can be used for buildings, highway embankments,  bridge abutment and large commercial applications.

Project of displacement pile system

Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile

Package and Delivery

Buckets and Augers are always wrapped in foam plastics and packed in wooden case. The cargo are shipped by sea or air according to the client's request.

Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile


Related Prodcuts

We are offering rock driling auger, soil drilling aguer, CFA, rock driling bucket, soil drilling bucket, cleaning bucket, core barrel.

Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile


Our Factory

Kimdrill Industrial Co. Limited focuses on Deep Foundation Drilling Tools and Piling Accessories. Headquatered in Changsha, we have been engaged in offering full range of tools for deep foundation engineering since 2008. 

Reduced Concrete Consumption Soil Displacement Pile Auger for Fdp Pile


FAQ

Q: What's the product range of Kimdrill?
A: Kimdrill produces full range of tools for deep foundation engineering, such as: drilling bucket, auger, kelly bar, casings tools, casing oscillators, drill bits, CFA, DTH and other pilling tools.


Q: What about the after sales service of Kimdrill?
A: Kimdrill offers good service in and after sales. All of our products are with warranty period,except some wearing parts.


Q: Could the visiting of factory be possible?
A: We warmly welcome customers to visit our factory anytime. Besides the visiting of factory, we also warmly welcome customers or the third parties to arrange inspection before delivery.


Q: How about the lead time?
A: Generally, the lead time is about 7-10 working days. The specific lead time will be offered in every quotation sheet.