Drilling machine in Construction:
Continuous Flight Auger (CFA)Specification of Drilling Machine spare parts CFA:Technical Data of Drilling Machine spare parts CFA: D Diameter(mm) | L Length (mm) | P Pitch (mm) | T Flght Thickness(mm) |
Φ300 | 3000 | 280 | 12 |
Φ400 | 3000 | 300 | 12 |
Φ500 | 3000 | 350 | 14 |
Φ600 | 3000 | 400 | 16 |
Φ700 | 3000 | 400 | 16 |
Φ800 | 3000 | 400 | 16 |
Φ900 | 3000 | 600 | 20 |
Φ1000 | 3000 | 600 | 20 |
* Other specifications are available upon requestsYou can choose CFA withA. Hexagonal Joint or Flanged JointB. Rock drill bits or Clay Drill bits CFA with Hexagonal Joint CFA with Flanged JointPackage and DeliveryBuckets and Augers are always wrapped in foam plastics and packed in wooden case. The cargo are shipped by sea or air according to the client's request.
Application
Related ProdcutsWe are offering rock driling auger, soil drilling aguer, CFA, rock driling bucket, soil drilling bucket, cleaning bucket, core barrel.
Our FactoryKimdrill Industrial Co. Limited focuses on Deep Foundation Drilling Tools and Piling Accessories. Headquatered in Changsha, we have been engaged in offering full range of tools for deep foundation engineering since 2008.
FAQQ: What's the product range of Kimdrill?
A: Kimdrill produces full range of tools for deep foundation engineering, such as: drilling bucket, auger, kelly bar, casings tools, casing oscillators, drill bits, CFA, DTH and other pilling tools.
Q: What about the after sales service of Kimdrill?
A: Kimdrill offers good service in and after sales. All of our products are with warranty period,except some wearing parts.
Q: Could the visiting of factory be possible?
A: We warmly welcome customers to visit our factory anytime. Besides the visiting of factory, we also warmly welcome customers or the third parties to arrange inspection before delivery.
Q: How about the lead time?
A: Generally, the lead time is about 7-10 working days. The specific lead time will be offered in every quotation sheet.