Small Pulp Egg Tray Forming Machine
The equipment is kind of molding machine, it is suitable for the customers who have the mass paper tray production such as egg tray, fruit tray, shoe tray and electrical packaging with different specifications.The production line includes 4 steps:pumping system, molding system, drying system and automatic packaging system.
Parameters for the main supporting equipments
Type | Capacity/hr | Mold/ chunks | Total Power | Labor force | Paper/hr | Drying Equipment |
SH-3-4 | 1800-3000 pieces | 12 | 40kw | 4-6 | 110-175kg | --------------- |
SH-4-4 | 2200-2500 pieces | 16 | 58kw | 4-6 | 175-200kg | 19kw |
SH-4-8 | 3000-4000 pieces | 32 | 120kw | 5-7 | 260-400kg | 19kw |
SH-5-8 | 4000-5500 pieces | 40 | 40kw | 5-7 | 270-450kg | 21kw |
SH-4-12 | 4000-5000 pieces | 48 | 160kw | 5-8 | 300-600kg | 26kw |
SH-5-12 | 5000-5500 pieces | 60 | 180kw | 6-9 | 350-700kg | 37kw |
2. Production Line include:1.) Pumping systemTo smash the water paper to pulp .
Hydrotherapy ,Pulp pump , Air compressor, agitator, Self priming pump, pulping machine.
2.) Molding SystemProduce the paper mold finished products
Full automatic egg tray forming machine, Vacuum pump , High pressure washer , Negative pressure tank , mould, Transfer mould, baler .
3.) Drying systemMulti -Layer Metal Drying
high efficient, goes into production fastly, short install time , less plant area required
here are 2 kinds of drying system : metal and brick. The conveyor plate can be one layer and multi-layer direct combustion hot air circulation. Using the imported or joint venture brand burner (domestic uses the stove bar), equipped with an automatic control cabinet.
4):Automatic packaging system3. Our Products4. Packaging and Shipping5.We Provide foreign installation
FAQ
Q: What capacity per hour do you offer ?
A: Our machines' capacity is from 1000pcs/hr to 6000pcs/hr.
Q: Do your products come with a warranty ?
A: Yes , we have one year warranty according the international practice.
Q: Can you give me a low price?
A: Yes,we are the manufacturer, at the same time we guarantee the quality, we will give you a lower price.
Q: How to install?
A: The seller dispatches engineers to buyer's factory. Buyer should help installation. Seller is responsible for installation, testing and training for 30 days, the buyer should insure the safety of the engineers.
Any questions, please be free to contact me!