Completed Aluminum Formwork Panel

China Completed Aluminum Formwork Panel, Find details about China Concret Aluminium Formwork, Aluminium Formwork from Completed Aluminum Formwork Panel

Model NO.
aluminum formwork panel
Delivery Time
21~28 Days
Applications
Construction, Villas, High-Class Building
Negotiable Payment Term
30%~50% Deposit, Balance Before Delivery
Trademark
HUALV
Transport Package
by Sea Container / Air
Specification
6063-T5
Origin
China Shandong
HS Code
76042100
Model NO.
aluminum formwork panel
Delivery Time
21~28 Days
Applications
Construction, Villas, High-Class Building
Negotiable Payment Term
30%~50% Deposit, Balance Before Delivery
Trademark
HUALV
Transport Package
by Sea Container / Air
Specification
6063-T5
Origin
China Shandong
HS Code
76042100

You dare to dream it, We care to build it

HUAJIAN GROUP was established in SHANDONG in 2000 with the focus of becoming a specialist in metalwork fabrication and erection. With the injection of new resources into the area of Building Construction, in 2005 HUAJIAN has since expanded its capabilities, and has become a General Contractor, specializing in many areas, including works, structural steelworks, building/refurbishment, building maintenance, addition and alteration works, associated E&M works etc. Through success in all these areas, HUAJIAN has elevated itself to become the first- to- be considered by clients who demand quality and sophisticated site management.
Completed Aluminum Formwork Panel

HUAJIAN's construction formwork system

With a vast accumulation of experience gained from works relating to metal fabrication and construction, HUAJIAN has successfully invented its own construction formwork system, It has the capability of providing clients with the whole spectrum of services including formwork design, production, and alteration, installation, and recycling. Like always, the aim of HUAJIAN is to provide its clients with impeccable products and services, in the total commitment to enhancing their erection efficiency. 

HUAJIAN is totally committed to listening to feedback on the formwork provided. By doing so HUAJIAN may achieve further improvement and may maintain quality and impeccable services and products on a continuous basis.
Completed Aluminum Formwork Panel


Materials

The aluminum panels by themselves are already of excellent quality. Nevertheless HUAJIAN continues to strive for excellence to attain even high quality. Research continues focuses in an attempt to develop a lighter panel with a greater strength. Such will eusure that during the processes of construction, possible damage of the panels may be avoided.  

To reduce manufacturing cost, HUAJIAN focuses on surface design and patchwork process, the end result of which is a high degree of smoothness. 

Completed Aluminum Formwork Panel
Completed Aluminum Formwork Panel

Completed Aluminum Formwork Panel

Easy to use

HUAJIAN tailor made different forming structures for clients' specific needs. The formwork connecting system uses cylindrical bolts and wedge-shaped inserts which is a very simple design without the need for any specific tools or techniques. Both installing and dismantling procedures can be carried out easily.
Completed Aluminum Formwork Panel

 

Safety design

HUAJIAN support system embodies oblique support, pipe support and square tube support. A variety of efficient system to meet different construction needs is available. Then strengthen the stability of the panel system and offer protection to workers.

 

Professional Teams

To continue to improve the quality of formwork, HUAJIAN has implemented professional and equipment optimization plan to meet the customers' requirements as well as providing good services and products. 

HUAJIAN has different professional teams including design, construction, production and customer service with excellent technical knowledge. We understand the unique requirements of each customer. As such, we strive to provide a tailor-made and all round solution to help them achieve their construction needs.

Completed Aluminum Formwork Panel

 

Production Centers and Advanced Machineries

HUAJIAN spares no effort in investing heavily in advanced machinery and in improving the working environment of outstanding products.

HUAJIAN owns and operates 2 production centers simultaneously. They are equipped with advanced technology with a good working environment. ZHITE Metal Products (SHANDONG) Co Ltd. occupies a factory area of 35, 000m2. In 2002, It was awarded  ISO9001 in Quality Management System. It is totally committed to providing quality products and impeccable services.

Completed Aluminum Formwork Panel
Completed Aluminum Formwork Panel

 

The production workshops include :

1)Punching:Responsible for shearing, punching and bending of all kinds of products

2)Molding:Responsible for secondary processing and mold making

3)CNC:Responsible for precision cutting

4)Welding:Responsible for various types of structural steel welding

5)Polishing and grinding:Responsible for product polishing and grinding

6)Sheet metal:Responsible for the secondary processing of all kinds of metal plate

7)Coating:Responsible for the enamel coating, polyester powder coating and conventional spray paint

8)Assembly:Responsible for pre-assembled of products

Completed Aluminum Formwork PanelCompleted Aluminum Formwork Panel

 

Comparison Between Different Formworks

 
The 4 Key Advantages of Aluminum Formworks

1.Environmental Friendly: The aluminum formworks can be recycled after smelting.

2. Shorten the Construction Period:Aluminum formworks are light in weight and highly precise in assembly. The installation process is easier and the installation time can be reduced by 30% compared with the wooden formworks. An area of 2,000 m2 aluminum formworks can be completed in about 35 hours.

3. Civilized Construction:Installing aluminum formworks does not generate much noise and storage area can be substantially reduced. The clean and tidy environment measures up to the stringent standards of modern construction.

4. Reduce costs: The aluminum formwork can be reused for more than 300 times. This can reduce the cost and time of batching procedures. This is evident in constructing the multi-layered high-rise buildings as well as highly modular structures.

The Comparison between Aluminum and Timber Formworks

Aluminum Formworks amortization: Divided by 300 after deducting the recycle value 
Timber Formworks amortization: Divided by 10


 
CharacteristicsAluminum FormworksTimber FormworksDifference
Amortization3.7314.40-10.67
Labour Cost2025-5
Cost of Secondary PatchingNo Secondary Patching16-16
Waste Disposal FeeNo waste2-2
Total23.7357.40-33.67
Completed Aluminum Formwork Panel