Factory Price Stainless Stee Round Welded Decoration Pipe Tube

China Factory Price Stainless Stee Round Welded Decoration Pipe Tube, Find details about China Stainless Steel Pipe, Stainless Steel Tube from Factory Price Stainless Stee Round Welded Decoration Pipe Tube

Trademark
Huaye
Origin
Shandong, China
HS Code
73064000
Trademark
Huaye
Origin
Shandong, China
HS Code
73064000
Specifications
 
1.We own cold rolled factory and pipe making factory 
2.High quality  
3.Aod material,can be bend and well used for many area 
 
Packaging & Delivery
Packaging Details:Every Grade 201 Stainless Steel Pipe is sleeved in plastic bag individually, and several tubes are packed to bebundle without any logo.
Delivery Detail:7-30days after ur downpayment

Factory Price Stainless Stee Round Welded Decoration Pipe Tube

Factory Price Stainless Stee Round Welded Decoration Pipe TubeFactory Price Stainless Stee Round Welded Decoration Pipe Tube



 
Products NameGrade 201 Stainless Steel pipe
StandardASTM A554, A249, A269 and A270, A312
Grade201 ( Ni 0.8%-1.5%),
Wall Thickness0.25mm-1.5mm
Out diameter9.5mm - 114mm
Size: 10*10 -100*100
         10*15 - 95*45
Length5.88m 6m .6.1m or as customers' request
 
Tolerance
a) Outer Diameter:  +/- 0.2mm
b) Thickness: +/- 0.02mm
c) Length: +/- 5mm
Surface180G, 320G, 400G Satin / Hairline
400G, 500G, Mirror finish
ApplicationDecoration construction, upholstery, industry instrument
Handrail, Railing, Staircase, Door, Window, Balcony, Fence, Bench, Furniture
TestSquash test, extended test, water pressure test, crystal rot test, heat treatment, NDT
 
 
 
 
Chemical Composition of Material
  Material
 
Composition
201202304
C≤0.10≤0.15≤0.08
Si≤1.00≤1.00≤1.00
Mn9-117.5-10≤2.00
P≤0.06≤0.06≤0.045
S≤0.03≤0.03≤0.030
Cr1317-1918-20
Ni1.0-1.34-68-10.5
 C u0.80-0.80   
 
Mechanical Property
Material Item      201202  
Tensile Strength  ≥535≥520 
Yield Strength  ≥245  ≥205 
Extension  ≥30%  ≥30% 
Hardness (HV)  <253 
<253
 
TermsPayment(1)30% in advance, the balance against b/l copy by  tt  within 3day
 
(2) 30% in advance, the balance by  l/c  at sight (large quantity)
Delivery time(1) within 7days after ur downpayment (stock)
 
(2)within 30day after ur downpayment(produce according to   
     ur    request)
Advantage we have our own steel plant,cold rolled factory,and pipe-makinf factory , best quality with reasonable price
PackingEvery tube is sleeved in plastic bag individually, and several tubes are packed to be
bundle without any logo.