China Karvil Stainless Steel Liquid/ Resin/ Paint Mixing Reactor Kettle for Mixing Paint/Upr Plant, Find details about China Epoxy Resin Production Reactor, Blending Reactor Tank from Karvil Stainless Steel Liquid/ Resin/ Paint Mixing Reactor Kettle for Mixing Paint/Upr Plant
Capacity | 50L | 100L | 300L | 500L | 1000L | 2000L | 3000L | 4000L | 5000L | 10000L | |
Motor Power (Kw) | 1.1 | 1.5 | 4 | 4 | 5.5 | 7.5 | 7-11 | 11-15 | 15-18.5 | 30 | |
Inner Material | Stainless Steel 304/316 | ||||||||||
Outer Material | Generally Carbon Steel (Can be customized all stainless steel) | ||||||||||
Dimension (mm) | L | 800 | 900 | 1100 | 1200 | 1400 | 2000 | 2200 | 2600 | 2700 | 2100 |
W | 800 | 900 | 1100 | 1200 | 1400 | 2000 | 2200 | 2600 | 2700 | 2100 | |
H | 1600 | 1700 | 2000 | 2000 | 2600 | 3200 | 3400 | 4000 | 4200 | 5000 | |
Weight (Kg) | 270 | 350 | 700 | 1000 | 1600 | 2100 | 2600 | 3200 | 4000 | 5000 | |
Reactor Type | Jacket electric heating reactor (water or oil) | Steam heating reactor (steam) | Outer coil reactor (water, oil and steam) | Electric heating enamel reactor (water and oil) | Harmonic kettle (oil) | ||||||
Speed | 63 rpm (with gear reducer) | ||||||||||
Sealing Way | Mechanical seals and packing seals | ||||||||||
Stirring Way | Generally frame type, 63 rpm (different speeds for different mixing methods) |
Widely used in petroleum, chemical, rubber, pesticide, dyes, medicine, food, used to complete the curing, nitrification, hydrogenation, alkylation, polymerization, condensation, and other process.
Karvil machinery --- a chemical equipment factory from Shandong, China.
More than 10 years of equipment research and development experience.
Serving the world from Asia to Europe, Africa, South America, and many other new and old customers.
Including the paint mixer, powder mixer, grinding equipment, glue machine, production line, etc.
Flexible delivery time, the fastest delivery in 10 days.
One-year warranty and lifetime service.
1. Guarantee.
Our product warranty period is one year. If the machine has broken within one year, you can send us videos and photos, and our engineers can help you analyze the problem. If you need to replace the parts, we will provide them for free within one year, and the parts will be charged after one year. The engineer's consulting service is free for life.
2. Installation.
The equipment is generally delivered as a complete machine, which is easy to operate. We can provide video guidance during the epidemic. Let you have no worries.
3. Delivery time.
Usually, it takes 20 to 30 days; the exact time also depends on the type and quantity of the product.
4. Delivery port.
Qingdao, China.
5. Who are we?
We are a chemical equipment manufacturer from Yantai, Shandong, China.