Plastic Spoon Injection Mould for Milk Power

China Plastic Spoon Injection Mould for Milk Power, Find details about China Mould, Plastic Injection Moulding from Plastic Spoon Injection Mould for Milk Power

Model NO.
RTE-08080802
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, CE, ISO
Standard
Hasco/Dme/Misumi/Punch
Customized
Yes
Core Steel
SKD61
Mold Size
250X400X320
Cycle Time
25-35s
Manufacturing Time
25-35 Days
Trademark
RootChina
Origin
Qingdao Shandong
HS Code
3926909090
Model NO.
RTE-08080802
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, CE, ISO
Standard
Hasco/Dme/Misumi/Punch
Customized
Yes
Core Steel
SKD61
Mold Size
250X400X320
Cycle Time
25-35s
Manufacturing Time
25-35 Days
Trademark
RootChina
Origin
Qingdao Shandong
HS Code
3926909090
Plastic Spoon Injection Mould for Milk PowerPlastic Spoon Injection Mould for Milk PowerPlastic Spoon Injection Mould for Milk PowerPlastic Spoon Injection Mould for Milk Power
Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.


Professional Auto Engine Part Mould Manufacturer over 10 years, certificated by ISO 9001: 2008.

Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Specification:
Item: Plastic Injection Mold
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1200 Ton

Offered Service:

Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment
Delivery Time: 30-45 days


The information has been udated on 2017-06-30.