Forced Circulation Boiler for Power Supply of Power Station

China Forced Circulation Boiler for Power Supply of Power Station, Find details about China Pressure Vessel, Steam Boiler from Forced Circulation Boiler for Power Supply of Power Station

Model NO.
Various
Accessroy
All Auxiliary Systems & Subsystems
Trademark
Runh
Transport Package
in Bulk
Specification
15t/h-200t/h
Origin
Shandong Province
Model NO.
Various
Accessroy
All Auxiliary Systems & Subsystems
Trademark
Runh
Transport Package
in Bulk
Specification
15t/h-200t/h
Origin
Shandong Province



Forced-circulation boiler refers to the type of boiler in which the circulation of water is not the result of the difference in density of saturated steam and water but that of pumping.

Compared to Natural Circluation Boiler where circulation is achieved due to the difference in the density of steam and water, Forced Circulation Boiler has following advantages:


1. Easy control of water supply: with water being pumped to boiler to be heat up by a pump, its flow can be easily adjusted to meet the demand of the volumn of vaporization .

2. Waterwall tubes of smaller diameter: Forced Circulation Boiler doesn't require waterwall tubes of great dimension to prevent unanticipated overheating incident, as the flow of water is adjustable by the pump. 

3. No need for the drum: The drum mounted on Natural Circulation Boiler is not necessary for Forced Circulation Boiler, for the same reason it only requires waterwall tubes of smaller size.



Forced Circulation Boiler for Power Supply of Power Station


Runh Power positions itself no only as a supplier of power plant equipment but also an independent contractor of EPC service (engineering, purchase & construction) delivering power station project. 

With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from the state bank. 

 
-1) Power Purchase Agreement (For independent power producers only) 
-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)
-3) Sovereign bonds (If sovereign bonds are acquired and the commissioner has 15 % of capital need for the project,  Runh Power could start the project while engaging China Export & Credit Insurance Corporation)
-4) Construction Permit (optional)
-5) Fire permit (optional)
-6) Environmental impact assessment (optional)
-7) Land Lease (optional)
-8) Power Generation Power (optional)
-9) Other documents deemed helpful (optional)

 

Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.

Forced Circulation Boiler for Power Supply of Power Station





1.The Argumentation of Project
   
a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
    b. Design of overall layout and all the sub-systems within the parameter of power plant. 
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
    a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
    a. Operation of power plant (technical counseling) (Optional)
    b.Regular maintenance and inspection (Optional)
    c.Technical Training Program for Power Plant Personnel (Optional)
    d.General Overhaul (Optional)
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.(Optional)

Notice: EPS service, which refers to Engineering, Purchase & Supervision of Construction,is also available at your request, in case you prefer local construction contractor to international contractor.

There are multiple types of boiler widely used in generating power available with Runh Power. Kindly copy and paste the link to your brower to learn more details.

1. Circulating Fluidized Boiler (best know for burning efficiency and wide range of fuel selection) : 
http://runhpower.en.made-in-china.com/product/kBQmZVExRzRt/China-Coal-Firing-Fluidized-Circulating-Bed-Steam-Boiler-for-Power-Supply.html

2. Boiler Island (a complete set of boiler equipment with all auxiliary systems distributed in different elevations) : 
http://runhpower.en.made-in-china.com/product/VoxmISsYYOTn/China-Coal-Firing-Boiler-Island-boiler-auxiliary-systems-.html

3. Heat recovery system: (mounted on the passage of exhauste of boiler to recover residual heat for generation power):
http://runhpower.en.made-in-china.com/product/OMxQAcCHXFGl/China-Heat-Recovery-System-for-Cement-Steel-Mill-Boiler.html

4.Chain Grate Boiler (where fuel is forcefully transported to burning from the motion of vibrating chain grate to achieve maximum burning efficiency.):

http://runhpower.en.made-in-china.com/product/eMnJgINbXFTD/China-Chain-Grate-Boiler-for-Coal-Gas-Biomass-Firing-Power-Station.html

For viewing complete scope of Runh Power's service and more models of boilers, please copy and paste following link to your browser. 

Runh Power's service catalog :
http://runhpower.en.made-in-china.com

Forced Circulation Boiler for Power Supply of Power Station