China Easy Assembled Install Light Weight EPS Cement Boards Prefab Prefabricated House Villa Precast Concrete Panels House, Find details about China Prefab Home, Prefab House from Easy Assembled Install Light Weight EPS Cement Boards Prefab Prefabricated House Villa Precast Concrete Panels House
I Easy Mobile Container House | II Fast Construction Steel Sandwich Prefab House | III Permanent Living Cement Prefab House |
15 Years Life Span A1 Level Fireproof 8 Levels Earthquake Resistance 150km/h Wind Load -50°C-50 °C Temperature Resistance 1-3 Storey 8-10 Sets/40Hq Loaded 4 Workers Finish 1 Set In 3 Hours | 15 Years Life Span A1 Level Fireproof 8 Levels Earthquake Resistance 150km/h Wind Load -50°C-50 °C Temperature Resistance 1-3 Storey About 120m2 House /40HQ Loaded 5-6 Workers Finish 300m2 House In2-5 Days | 50 Years Life Span A1 Level Fireproof 8 Levels Earthquake Resistance 180km/h Wind Load -50°C-50 °C Temperature Resistance Construct High-Rise Building About 100m2 House/40HQ Loaded 5-6 Workers Finish 200m2 House In 2-5 Days |
|
Component | Description |
Main Steel Structure | 2-4mm Hot Galvanized Steel+Power Coating |
Wall Panel | 50,75,100mm Eps/Rock Wool/Glass Wool Sandwich Panel |
Roof Panel | 50,75,100mm Eps/Rock Wool/Glass Wool Sandwich Panel |
Flooring | 18mm Water Proof Mgo Board +2mm Floor PVC Leather |
Door | 900mm*2000mm Or As Request |
Window | 800mm*1000mm Or As Request |
Component | Description |
Main Steel Structure | Hot Galvanized Steel Structure,And Power Coating As Weather Request |
External Wall Panel |
|
Internal Wall Panel | |
Roof Panel | Mainly Similar As Above Wall Panel, Except The Face Is Corrugated Color Steel Panel For Rain Water Easier Flowing |
Door | Size As Request |
Window | Size As Request |
Component | Description |
Main Steel Structure | Hot Galvanized Steel Structure,And Power Coating As Weather Request |
External Wall Panel |
|
Internal Wall Panel | |
Floor Supporting Panel | |
Roof Panel | |
Door | Size As Request |
Window | Size As Request |
Item | I Container House | Ii Steel Sandwich Panel House | Iii Permanent Living Cement Prefab House |
External Wall | Painted Steel Wall Surface Used Directly Or Decorated As Like | Painted Steel Wall Surface Used Directly Or Decorated As Like | Stone Painting, Latex Painting Directly Or As Request |
Internal Wall | Painted Steel Wall Surface Used Directly Or Decorated As Like | Painted Steel Wall Surface Used Directly Or Decorated As Like | Latex Painting/ Ceramic Tiles/Pasting Wallpaper/ Wood Panel |
Roof | Painted Steel Roof Used Directly Or Decorated As Like | Painted Steel Roof Used Directly Or Decorated As Like | Asphalt Waterproof Roll Or Roof Tiles |
Floor | PVC Leather Or As Like | Ceramic Tiles/Wooden Floor/PVC Leather | Ceramic Tiles/Wooden Floor |
Ceiling | Painted Ceiling Steel Surface Used Directly Or Decorated As Like | Gypsum Board / Wood Pane | Gypsum Board / Wood Panel |
Door | Steel Security Door/Aluminum Alloy Door / PVC Door/ Wooden Door | ||
Window | PVC/Aluminum Alloy Sliding Window With Double/Single Glass With Guard Railing Or Screen Window As Like | ||
Kitchen | Kitchen Cabinet And Kitchen Ware | ||
Bathroom | Shower Room, Bathtub, Toilet And Washing Basin | ||
Electrical System | Socket, Switch, Power Distribution Cabinet, Wire Hidden Installation In The Wall Panel | Socket, Switch, Power Distribution Cabinet, Wire Hidden By Wire Slot | Socket, Switch, Power Distribution Cabinet, Slotted And Installed In The Wall Same As The Traditional Concrete Building |
Water System | Outside The Wall | Outside The Wall | Slotted And Installed In The Wall Same As The Traditional Concrete Building |
Roof Drainage System | Roof Reserved Water Falling System | Installed Same As Traditional Way | |
Solar Power System | Professionally Fitted Solar Power System From 2006 |
Prefabricated House / Prefab House / Modular House / Prefab Steel Building / Pre Engineered Building / Mobile House / Movable House / Prefabricated Home / Light Steel Frame Structure Building / Villa / Apartment / Accommodation / Labor Camping / Tent / Cabin / Office / School / Classroom / Hotel / Warehouse / Workshop / Plant / Carport / Restaurant / Dormitory / Permanent Living House Projects / Temporary Living House Project |
Step 1:Customer Select standard designs or sends detail design ( Layout with size, Appearance etc) together with tech data |
Step 2: Customized Solution with Quotation would be sent based on request |
Step 3: Negotiate and confirm each details of goods, trading terms and so on, get agreement and sign contract. |
Step 4: Advanced payment and arrange production, to confirm the delivery time with customer |
Step 5: Factory Examine Goods/ rectify and reform to meet the requirements of contract. |
Step 6: Balance payment and shipping in time |
Step 7: Handing Shipping files to help clients get goods from transporter in time. |
Step 8: Customer prepares to do foundation work after receiving foundation information |
Step 9: Customer gets goods and on site construction, would send engineer to help to install and train labors as request and go into warranty time |
|