China High Ribbed Steel Scaffolding Formwork for Concrete Project, Find details about China High Ribbed Formwork, Unremovable Metal High Rib Formwork Net from High Ribbed Steel Scaffolding Formwork for Concrete Project
High Ribbed formwork is manufactured from hot-dipped galvanized steel sheets. Because its meshes and U patterns, it has better anti-stress capability and forming flexibility than normal metal lath. This product has excellent engineering quality, construction security and widely used in building construction to form retaining walls, columns, stop ends, construction joints and used to support slab flooring.
Model | Thickness (mm) | Weight (kg) | Width (mm) | Length (mm) | Rib Height (mm) | Rib Distance (mm) |
QKHR021 | 0.21 | 1.70 | 450 | 2200 | 14-20 | 90 |
QKHR023 | 0.23 | 1.90 | 450 | 2200 | 14-20 | 90 |
QKHR030 | 0.30 | 2.48 | 450 | 2200 | 14-20 | 90 |
QKHR035 | 0.35 | 2.90 | 450 | 2200 | 14-20 | 90 |
QKHR040 | 0.40 | 3.30 | 450 | 2200 | 14-20 | 90 |
QKHR045 | 0.45 | 3.70 | 450 | 2200 | 14-20 | 90 |
QKHR050 | 0.50 | 4.10 | 450 | 2200 | 14-20 | 90 |
Note: Special size and specifications can be made according to customers requires. |
Q: What information should I provide,if I want a lowest quotation?
A: The specification of wire mesh.Such as material,the size of product, the thickness of metal plate,the rib height,rib distance,final quantity and so on.
Q: Are you a manufacturer or a trader ?
A: we are a professional manufacturer,we have specialized in this field for about 20 years experience.
Q: Could you provide sample ?
A: Yes,we can provide sample in half A4 size along with our catalogue. However, the courier charge will on your side. We'll send back the courier charge if you make an order.
Q: How is your delivery time?
A: We always prepae enough stock material for your urgent requirement. the delivery time is 7days for all the stock material.
We'll check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.