Silicone Rubber Keypad Numberletter Button Injection Tooling

China Silicone Rubber Keypad Numberletter Button Injection Tooling, Find details about China Injection Mould, Injection Mold from Silicone Rubber Keypad Numberletter Button Injection Tooling

Model NO.
w119
Runner
Hot Runner
Design Software
Ug,CAD,Moldflow,Proe,Catia,Solidwork
Installation
Fixed
Certification
TS16949, ISO, FDA
Standard
Local/Hasco/Dme/Misumi
Customized
Customized
Gate Type
Yudo Runner, Hot Runner, Cold Runner, Sub Gate,Edg
Mold Steel
P20,718,2738h,Nak80,H13,8407,1.2344
Cycle Time
15-60s
Cavity
as Per Client′s Requirement
Production Material
as Per Client′s Requirement
Shape
Based on Drawings
Heat Treatment of Steel
HRC48-52
Our Service
Dfm Report,Mould Flow,Mould Design,Mpr,QC Report,
Trademark
MYMOULD
Transport Package
Carton
Specification
Customized
Origin
Shanghai, China
HS Code
8480719090
Model NO.
w119
Runner
Hot Runner
Design Software
Ug,CAD,Moldflow,Proe,Catia,Solidwork
Installation
Fixed
Certification
TS16949, ISO, FDA
Standard
Local/Hasco/Dme/Misumi
Customized
Customized
Gate Type
Yudo Runner, Hot Runner, Cold Runner, Sub Gate,Edg
Mold Steel
P20,718,2738h,Nak80,H13,8407,1.2344
Cycle Time
15-60s
Cavity
as Per Client′s Requirement
Production Material
as Per Client′s Requirement
Shape
Based on Drawings
Heat Treatment of Steel
HRC48-52
Our Service
Dfm Report,Mould Flow,Mould Design,Mpr,QC Report,
Trademark
MYMOULD
Transport Package
Carton
Specification
Customized
Origin
Shanghai, China
HS Code
8480719090

Silicone Rubber KeyPad number/letter Button Tooling
 

1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to  be before mold making. 
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.

Mould material

Plastic mould material: P20 steel, 718, 2738,H13, NAK80,1.2344,2343,S136,etc....

Fast mould design

We can be within 1-3 working days after getting customer's drawings.

Lead time

Plastic moulds: 2- 7 weeks after getting the mould design confirmation.

Mould testing

All of the moulds can be well tested before the shipments. Videos testing the moulds are available.

Minimum order

Small orders can be accepted.

Production capacity

45-50 sets/month.

Port

Shanghai

Runner

YUDO runner, hot Runner, cold runner, sub gate/edge gate /cow horn gate…etc

Payment terms

L/C T/T Western Union MoneyGram.

Mould making service

OEM/ODM service is available.

After-sales service

Life-long gurantee.

Safe packing

In strong wooden pallets to avoid any damages during long transportation.


Silicone Rubber Keypad Numberletter Button Injection Tooling
Silicone Rubber Keypad Numberletter Button Injection Tooling
Silicone Rubber Keypad Numberletter Button Injection Tooling
Silicone Rubber Keypad Numberletter Button Injection Tooling













Silicone Rubber Keypad Numberletter Button Injection Tooling









Silicone Rubber Keypad Numberletter Button Injection Tooling
Silicone Rubber Keypad Numberletter Button Injection Tooling
Silicone Rubber Keypad Numberletter Button Injection Tooling
Silicone Rubber Keypad Numberletter Button Injection Tooling
Silicone Rubber Keypad Numberletter Button Injection Tooling

Silicone Rubber Keypad Numberletter Button Injection Tooling


          Silicone Rubber Keypad Numberletter Button Injection Tooling