China Spray Booth Paint Stand Spray Booth with External Lighting, Find details about China Paint Booth, Car Spray Booth from Spray Booth Paint Stand Spray Booth with External Lighting
Outside Dimension (mm) | 18156*6906*5800(L*W*H) | Inside Dimension(mm) | 18000*5000*5000(L*W*H) |
Front Door(mm) | 4000*4500(W*H) | Service door (mm) | 1800*650(W*H) |
Total Power | 98KW | ||
Cabin system | Wall panel | 75mm EPS sandwich panel, steel sheet thickness: 0.6mm | |
Ceiling panel | 50mm rock-wool panel. | ||
Windows | 4mm safety tempered glass | ||
Air Make-up System | Air Inlet fan system | 6*7.5kw centrifugal belt-drive fan, proof-explosion motor. | |
Exhausted fan system | 3*15kw centrifugal belt-drive fan, proof-explosion motor. | ||
Ai capacity for fresh air | 22000m3/h *6 | ||
Air capacity for exhausted air | 19500m3/h *3 | ||
Air Flowing speed | 0.25m/s in empty booth | ||
Air Control method | One manual damper for exhausted system | ||
Exhausted ducting | 6meters straight ducting, one 90°elbow for each unit fan system. | ||
Purification System | Pre-filter | G3 grade | |
Ceiling filter | EU5 / F5 | ||
Floor filter | green fiber glass filter / G3 grade | ||
Exhausted fan Filters | M green fiber glass filter. | ||
Heating System | Heat Exchanger | SUS304 material, argon arc welding. | |
Heating burner: | 3 sets Riello RG5S diesel oil burner(gas burner for option) | ||
Heating productivity | 260000Kcal/h/ burner | ||
Spray to baking switch | 20N BELIMO brand electrical damper | ||
Chimney ducting | 6 meters stainless ducting for each heating system | ||
Max heating temperature | 80degrees | ||
fuel consumption | 10-15L /vehicle | ||
Lighting System | Ceiling lights | 22 Units, each 4 x 36W lamps, Total 3312 W | |
Side lights | 26 Units, each 2 x 36W lamps, Total 1872 W | ||
Illumination | 900LUX | ||
Controlling system | Micro-computerized programming system | Spraying & baking switch, lighting switch, emergency stop, breakdown alarm, failure alarm, pressure gauge |
Q: Which Port of loading?
A: Mainly ship from Ningbo port / Shanghai Port/Guangzhou Port.
Q: What is your MOQ?
A: All the products can be mixed in one container with low MOQ 1pcs.
Q: What is the Lead Time?
A: Normally it needs 20-25 days.
Q: What is the Payment Terms?
A: T/T/ 30% deposit before production and 70% before delivery.