China Bioevopeak Vf-P10 Vein Imaging System / Vein Finder, Find details about China Vascular Imaging Apparatus, Vein Imaging System from Bioevopeak Vf-P10 Vein Imaging System / Vein Finder
Bioevopeak VF-P10 Vein Imaging System / Vein Finder
Visualization Modes
Brightness
Adjustable brightness allows clinicians customizing the image brightness base on the environment light.
Colors
Switchable colors can fit different needs from the nurses.
Inverse
Clinicians can highlight the veins or highlight the surrounding tssue.
Item | Parameter |
Vein Detecting Light Source | Near infrared light |
Infrared Light Wavelength | 850 nm |
Light Radiation | No |
Battery | Lithium-ion Battery, 3.6V, 4300mAh |
Continuous Run Time | 4 hours |
Battery Charge Time | 3 hours |
AC Power Suplly | 100-240VAV, 50-60Hz, 0.4A |
Battery Charge Power | 5VDC, 2A |
Weight | 490g |
Dimension (L*W*H) | 240mmx60mmx60mm |
Best Imaging Distance | 20±2cm |
Model | Description | Package Size | Gross Weight | ||||
VF-P10 | Vein Imaging System / Vein Finder | 30*21*12cm | 1.5kg | ||||
VF-P10-SP1 | Mobile support for VF-P10 | 60*60*15cm | 6.3kg | ||||
VF-P10-SP2 | Fixed support for VF-P10 | 72*18*13cm | 1.5kg |
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.