Drilling Rig Site Workforce Lodging Prefab Modular Containerized Units

China Drilling Rig Site Workforce Lodging Prefab Modular Containerized Units, Find details about China Modular Home, Duplex Container Homes from Drilling Rig Site Workforce Lodging Prefab Modular Containerized Units

Model NO.
KHCD
Wall Panel
60mm EPS/Rockwool/PU Sandwich Panel
Color
Ral Color
Door
Steel Door/Sandwich Panel Door
Connection
Screws,Bolts
Application
Accomodation, Family House,Holiday House
Trademark
K-HOME
Transport Package
Container Shipping
Specification
Customized
Origin
Henan, China
HS Code
94060000
Model NO.
KHCD
Wall Panel
60mm EPS/Rockwool/PU Sandwich Panel
Color
Ral Color
Door
Steel Door/Sandwich Panel Door
Connection
Screws,Bolts
Application
Accomodation, Family House,Holiday House
Trademark
K-HOME
Transport Package
Container Shipping
Specification
Customized
Origin
Henan, China
HS Code
94060000

Drilling Rig Site Workforce Lodging Prefab Modular Containerized Units :

 1.Compared with the civil building, easy construction,cost-saving, time-saving, labor-saving, and transportation convenient.
2.You can move the container by Crane or Forklift, which is very convenient.
3..Environmental-friendly materials can be assembled and disassembled six times, flexibly fix.
4.Lots of styles and different colors for your choosing.
5.Fire proof,water proof,corrosion-resistance,sound-insulating,heat-insulating.
6.All the steel structures are painted and anti-rust for more than two times normally can use for more than 20 years.
Drilling Rig Site Workforce Lodging Prefab Modular Containerized Units
Drilling Rig Site Workforce Lodging Prefab Modular Containerized Units
Drilling Rig Site Workforce Lodging Prefab Modular Containerized Units

Drilling Rig Site Workforce Lodging Prefab Modular Containerized UnitsDrilling Rig Site Workforce Lodging Prefab Modular Containerized Units

sizeNumber of floorsThree Floors
TypeContainer House
Unit Area18m²
Length6m
Width9m
Height2.8m
Floor SystemSteel frame3mm Galvanized Steel for main structure + 1.5mm square tube for the secondary beam
Floor15mm MGO board + PVC leather floor
Roof SystemSteel frameThe steel frame is Q235 galvanized fitting;
Roof insulationThe ceiling is steel pre-coated 0.4mm outside strong steel sheet;
With 50mm glass wool insulation material;
Roof ceilingThe ceiling is shaped steel plate with different pattern
Column SystemColumn2.5mm Shaped Galvanized Steel
Sandwich Wall SystemWall Panel50mm Sandwich Panel ;
The outside color is light silver-gray (0.35mm thickness steel );
Inside is white color steel (0.35mm thickness steel ).
Door & window systemDoorMaterial: Steel door
Size: 2000*980mm(H*W)
WindowMaterial: Aluminum alloy steel double hollow glass sliding window (including screens)
Size:1200*1000mm(H*W)
Electric systemIncludes ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set,
Electrical box with safety protection device connecting cable for connecting;
AccessoriesElectric wire; sealant; wiring tube; screws and other accessories.

Drilling Rig Site Workforce Lodging Prefab Modular Containerized Units

Drilling Rig Site Workforce Lodging Prefab Modular Containerized UnitsDrilling Rig Site Workforce Lodging Prefab Modular Containerized Units


FAQ?

Q: Are you a factory or trading company?
A: We are a real factory, we have 3 plants in Xinxiang City, Henan Province, China

Q: How about your production capacity?
A: Container House: 1000 sets per month.
Prefab House: 40,000 square meters per week.

Q: How about your quality control?
A: We have got ISO9001:2015 and CE certificate Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects.

Q: Is third-party inspection available?
A: SGS, BV, TUV, etc. are available, it is according to client requirement.

Q: How about your delivery time?
A: Generally within 15 days, it is according to the order quantity, partial shipment is allowed for big orders.

Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do a Turnkey job for some kind of project.

Q: How to ensure the product you supply is what we want exactly?
A: Before placing an order, our sales and engineers team will provide you a suitable solution according to your requirements. CAD drawing, 3D drawing, Materials photos, Finished project photos are available, which will help you understand the solution we provided deeply.