China PP Strap Band Extrusion Machine 4 Lines, Find details about China Plastic Packing Belt Extruder, Strap Manufacturing Machine from PP Strap Band Extrusion Machine 4 Lines
How about this PP Strap making machine?
Items | We | others |
Equipment applicable raw materials | New and recycled pp granules Waste strap can be added | Just new and good recycled pp granules |
Max.capacity | 160kg/h | 100kg/h |
Energy consumption | 30-60kw.h | 40-78kw.h |
Screw material | 38CrMoAIA | 38CrMoAIA |
Embossing roller material | φ156×170 (SKD-11) | φ155.5×100(SKD-11) |
Cooling tank material | stainless steel(304) | stainless steel |
What are the main configuration and technical parameters of your equipment?
Model name | [LQD4-V] |
Main applicable raw material | New and recycled PP granules, waste strap can be added |
Production strip number | 4 |
Specified line speed(m/min) | 260 |
Max capacity(kg/h) | 160 |
Product tape type (automatic, semi-automatic, manual) | automatic, semi-automatic, manual |
Tape thickness (mm ) | T=(0.5-1.0) |
Sichuan Union Technology Co.,Ltd. is located in the beautiful scenery along the Tuojiang River in Ziyang, Sichuan,Our company mainly involved in plastic packaging belt production equipment, waste plastic recycling equipment and plastic products and other fields,She is a "plastic machinery as the main, plastic products, theory and practice combined", research and development, production, sales in one of the scientific and technological companies.The company has research and development department, technical department, trade department, production department, property control department, finance department and so on.
1.How long is the delivery time of the equipment?
In the case of standard configuration, the equipment is delivered within 60 working days.
2.What is the charging standard for equipment installation and commissioning?
For the first time installation and commissioning, our company only collects the travel expenses and visa fees of the security personnel. The buyer needs to be responsible for the accommodation and accommodation of the engineer.
3.Is there a charge for the on-site operation training?
No
4.Can your equipment be upgraded in the future?
of course can
5.How to solve your equipment if there is a problem? How long can it be solved?
The equipment technology is mature. Under normal circumstances, as long as it is operated properly, there will be no major problems. If the customer is unable to solve the problem, based on the timeliness, first communicate with our engineers through the network. If the communication still cannot be solved, we will send the work to the customer site within 48 hours
6.If I buy your equipment, can I buy accessories for a long time?
Our wearing parts are stocked to ensure that the production is not delayed.
7.You will not be a foreign trade company without a production factory.
We are a production-oriented factory, and we have the right to export at the same time, we can export ourselves. Self-produced
8.What are the ways we pay?
Our payment methods are T/T and letter of credit. Of course, we also encourage customers to conduct transactions through the Alibaba platform's letter insurance, which provides additional protection for the first-time buyers.