INTRODUCTION
This corn flakes processing line use corn powder, rice powder or other cereals as the materials, after extruding, flaking, drying, roasting, coating and cooling to produce such ring, grain or flakes shape, these kinds of food can be mixed with coffee or milk. Of course, it can be eaten directly as snacks, good taste.
The MG65-III line, the capacity is 120-150kg/h.
The procedure is mixing→extruding→flaking→drying →inflating→coating→drying→ cooling
DETAILED INFORMATION
NO | Machine | Motor Power | Capacity | dimension | Function |
1 | Mixer | 4KW | 50kgs /once time | 0.8*0.7*1.5m | To mix the raw materals with the water |
2 | Screw Conveyer | 1.1KW | 100-150kg/h | 3.0*0.8*2m | To send the materials to the extruder |
3 | MG65-III Double Screw Extruder | 30KW | 120-150kg/h | 3.0*1.2*3.0 m | To extrude and inflate the food.the main machine of the line |
4 | Sifter | 0.55KW |
| 2.0m length | To cool and sifting the corn flakes. |
5 | Air Conveyer | 1.5KW |
| 4.1m length | To connect two machines |
6. | Flaking Machine | 5.5kw | 150kg/h | 1.8×1.1×1.2m | To flake the corn pellets into corn flakes |
7 | 5 layers 5 meter Gas oven | 8L/h | 150-300kg/h | 6.0×1.4×2.0m | To dry the corn flakes |
8 | High-Temperature Oven | 12L/H | 100-150kg/h | 3.0*1.5*1.5m | To inflate the corn flakes |
9 | Incline Hoister | 0.37kw |
| According packing machine size | To send food into packing machine |
Remark:
1.Payment term: By T/T, the 30% of total value paid in advance as down payment, the balance 70% paid before shipment
2.warranty: For the quality of goods, the Seller gives the warranty of 24 months, issued on the day of its consignment, and guaranties that in the mentioned period will replace or repair on the proper expenses, in the proper factory all the parts, damaged as the result of defect materials of fault execution. The appeals in the warranty period have to be under the same period. The damages caused by the improper use, lack of knowledge of instructions or normal tear are excluded from the warranty.
3. Packing: The Seller is obliged to pack the subject of the Contract for the transport in the appropriate packaging, according to the Regulations of the Seller's country.
4.Delivery time: Within 35 days after down payment be made