China 63-250mm Automatic Hydraulic Butt Fusion Welding Machine/Butt Fusion Welding Machine with Wheel/PE Pipe Welding Machine Butt Fusion/Gas Powered Butt Fusion Weld, Find details about China HDPE Pipe Welding Achine, Joint Welding Machine from 63-250mm Automatic Hydraulic Butt Fusion Welding Machine/Butt Fusion Welding Machine with Wheel/PE Pipe Welding Machine Butt Fusion/Gas Powered Butt Fusion Weld
Suitable for welding of plastic pipes and fittings made from PE, PP & PVDF. Be made of Aluminum material. Consists of Planning
Tool, Heating Plate, Basic Frame, Hydraulic Unit and Support.
1. Removable PTFE coated heating plate with separate temperature control system.
2. Electric Planning Tool with reversible double cutting edge blades.
3. Hydraulic Unit provides welding machine with compressing power.
4. Be made of Aluminum material.
5. Low starting pressure ensures reliable welding quality of small pipes.
6. Temperature Controller and Timer, easy to know the exact time and temperature.
Model | S160 | S200 | S250 | S315 | S355 |
Welding range(mm) | DN63mm-160mm | DN63mm-200mm | DN90mm-250mm | DN90mm-315mm | DN160mm-355mm |
Heating plate temperature | 270°C | 270°C | 270°C | 270°C | 270°C |
Heating plate surface temperature(170-250°C) | <±5°C | <±5°C | <±5°C | <±5°C | <±5°C |
Pressure adjustment range | 0-6.3MPa | 0-6.3MPa | 0-6.3MPa | 0-6.3MPa | 0-6.3MPa |
Working Voltage | 220V | 220V | 220V | 220V | 220V |
Heating plate power | 1.5KW | 1.8KW | 2.3KW | 3.1KW | 3.5KW |
Cutter power | 1.0KW | 1.0KW | 1.1KW | 1.1KW | 1.1KW |
Hydraulic station power | 0.75KW | 0.75KW | 0.75KW | 0.75KW | 0.75KW |
Option parts: | Stub end holder |
1) Advanced laboratory
2) Mature fusion welding technology
3) Spare parts warehousing quality inspection, inspection during the production process, complete machine inspection and commissioning before delivery.
4) Cooperate with well-known universities, participate in the drafting of GB national standard, provide training for fusion welding technicians at home and abroad, and support free online video guidance.
5) Sufficient spare parts inventory, short delivery time, less than 50 sets, delivery time 7-10 working days, in line with ROHS 2.0 standard.