China High Performance Prelocator Cable Fault Tester Underground Cable Fault Distance Locator Cable Tracker Pinpointer, Find details about China Pipe Cable Locator Pinpointer, Cable Fault Tester from High Performance Prelocator Cable Fault Tester Underground Cable Fault Distance Locator Cable Tracker Pinpointer
PCLD-904P Cable fault pinpointer:
1.Application: For power cable main insulation fault pinpointing.
2.PCLD-904P Pin pinpointing advantages:
1.The test accuracy is < 0.1M and high class in our market ;
2. It is also use HUAWEI charger etc.
3.Sound magnetic synchronous method and filter etc.
RCI-601P Pipe locator:
1.Application:
For dead and running cable and metallic pipe route tracing,depth measurement and identification.
2. Our pipe locator has below advantages:
1).The max transmitter power is 12W .
2).We add a booster to increase the transmission signal strength and make the test more accurate.
3). Frequency:
Grewin:GWRCI-601P have multi frequency and max frequency can up to 197Khz
We can give you warranty period and good after sales sevices.
Grewin 32kv DC HV Generator cable tester fault location Test Equipment for cable faulty
1.Introduction
The HVSG-500G Integrated High Voltage Signal Generator is used to offer signal source for the fault locating and pinpointing. Together with the
PCLC 910D&PCLD-901P items, it's easy to do:
Output surge voltage | 0~32KV, Step variable |
Max. power energy | 2000J |
Energy-storage capacitor | 4μF |
Power | AC 220V.50Hz |
Volume | 400mm×460mm×300mm |
Weight | 25 kgs |
Operating Temperature | -10ºC-40ºC |
Humidity | 5-90%RH |
Elevation | <4500m |
Output surge voltage | 0~32KV, Continuously variable |
Max. power energy | 1000J |
Energy-storage capacitor | 2μF |
Power | AC 220V.50Hz |
Volume | 400mm×460mm×300mm |
Weight | 25 kgs |
Operating Temperature | -10ºC-40ºC |
Humidity | 5-90%RH |
Elevation | <4500m |
NO | Step | Days need |
1 | Request for quotation | 1 day |
2 | Making quotations | 1 day |
3 | Offer and counter offer | 3 days |
4 | Sending and receiving samples | 3-10 days |
5 | Sample confirmation | 3 days |
6 | Placing a firm order | 1 day |
7 | Paying and receiving the down payment | 1-4 day |
8 | Factory production & Quality inspection | 15 days |
9 | Paying and receiving the balance | 4 days |
10 | Delivery of goods | 1 days |
5.Contact info:
Alice.Lee
Tianjin Grewin Technology Co.,Ltd.
Web:transformer.en.made-in-china.com