Water Downspout Roll Forming Machine

China Water Downspout Roll Forming Machine, Find details about China Pipe Machine, Roll Forming Machine from Water Downspout Roll Forming Machine

Model NO.
YX74.5-103
Customized
Customized
Advantage
Use Widely
Condition
New
Color
Blue and Yellow
Trademark
SAIBO
Transport Package
No Packing
Specification
CE SGS
Origin
Jiangsu, China
HS Code
84552210
Model NO.
YX74.5-103
Customized
Customized
Advantage
Use Widely
Condition
New
Color
Blue and Yellow
Trademark
SAIBO
Transport Package
No Packing
Specification
CE SGS
Origin
Jiangsu, China
HS Code
84552210
1. Profile drawing:
Water Downspout Roll Forming Machine
NoSpecification of the material
1
 
Suitable MaterialColored Steel plate
2
 
Width of the raw materialAbout 444mm
3Thickness0.4-0.7mm

Machine Detailed Parameters:
1Machine structureWall board structure
2Total powerMotor power-4kw
Hydraulic power-5.5kw
3Roller stationsAbout 20 stations
4Productivity0-15m/min
5Drive systemBy 1.0 inch single chain
6Diameter of shaft¢65mm solid shaft
7
 
Voltage380V 50Hz 3phases (Customized)
8
 
Container need40GP container

3. The Chart of Process Flow
Water Downspout Roll Forming Machine
4. Packing & Delivery
  1. Deliver time: take goods after receive deposit 60 days
  2. Packing: suitable of ocean transportation
5. Warranty
  1. Warranty: 1 year warranty from date of shipment
  2. Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment