China Prime Quality Az150 Aluzinc Galvalume Aluzinc Coil, Find details about China Steel Coil, Aluzinc Steel Coil from Prime Quality Az150 Aluzinc Galvalume Aluzinc Coil
g550 aluzinc steel coil making corrugated roof sheet
Commodity | Galvalume steel coil |
Thickness | 0.12mm-3mm |
Width | 600-1500mm.600mm/750mm/762mm/914mm/1000mm/1200mm/1219mm/1220mm/ 1250mm |
Types | Hot Dipped Galvanizing/galvaume |
Zinc coating | 30-275g/m2 |
Material | SGCC/CGCC/ST01/TDC51DZM/TDC52D/TDC53D/TS280GD/TS300GD/TS350GD/TS550GD, DX51D+Z/TSGCC,JIS G3312-CGCC, CGC340-570, (G550),ASTM A755M CS-B, SS255-SS550,etc |
Standard | EN 10142,EN 10147,EN 10292,JIS G3302,ASTM A653/A653M,Q/BQB 420 |
Shipment |
|
Loading port | Xingang,China |
Coil weight | 3-5 tons |
Application | construction,household appliance,automobile,light industry,roofing etc. |
Package | Waterproof packing: A layer of oiled paper; A layer of plastic film; A layer of steel sheet; Outmost layer are 7 pieces of steel strips. Coil ID is 508mm. |
Payment terms | TT or LC at sight |
1.wrap water-proof paper.
2.wrap plastic film
3.steel cover
4.4 pcs steel transverse binding strip.
5.side cover
6.steel protection angle
7.4 pcs longitudinal binding strip
8.packing finalization
TIANJIN ANXINTONGDA STEEL PIPE CO., LTD is located In Tianjin,China,we mainly supply Square/Rectangular Steel Pipes,Galvanized Pipes,Erw Black Steel Pipes,Galvanized Steel Coils,Galvalume Steel Coils,Ppgi Coils,,Angle Bar,Flat Bar.We have our own factory .Our products are widely used in buildings, bridges, tunnels, culverts and other horizontal formwork support.Our products are sold well both in domestic and overseas market.
Q1: Are you trading company or manufacturer ?
A1: We are factory.
Q2: How long is your delivery time?
A2: Generally it is 10-20 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.
Q3: Do you provide samples ? is it free or extra ?
A3: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What is your terms of payment ?
A4: 30% T/T in advance ,balance before shippment or L/C at sight.