China PVC Insulation Aex Copper Wire for Engine Power Cable, Find details about China Copper Wire, Power Cable from PVC Insulation Aex Copper Wire for Engine Power Cable
PVC Insulation AEX Copper wire for Engine power cable
★Rated temperature:120ºC
★According to JASO D 608-92
★Stranded,tinned or bare copper conductor 0.5--8 m2
★Cross linked polyethylene(XLPE) insulated
★Uniform insulation thickness of wire to ensure easy stripping and cutting
★Resistant to oil,ozone and abrasion
★interal wiring in autmobile where high flexibility thermo and mechanical strength are required
Conductor | Finished product | Maximum Resistance at 20ºC | |||
Cross Sectional Area | NO.of Cond | Insulation Thick. | Outside Thick. | Weight | |
mm2 | No./mm | mm | mm | kg/km | Ω/mm |
0.5F | 20/0.18 | 0.5 | 2.0 | 8.52 | 38.6 |
0.5 | 7/0.32 | 0.5 | 2.0 | 8.93 | 34.6 |
0.75F | 30/0.18 | 0.5 | 2.2 | 11.43 | 25.8 |
0.85 | 11/0.32 | 0.5 | 2.2 | 12.35 | 22.0 |
1.25F | 50/0.18 | 0.6 | 2.7 | 18.14 | 15.5 |
1.25 | 16/0.32 | 0.6 | 2.7 | 18.25 | 15.1 |
2 | 26/0.32 | 0.6 | 3.1 | 27.06 | 9.3 |
3 | 41/0.32 | 0.7 | 3.8 | 41.84 | 5.9 |
5 | 65/0.32 | 0.8 | 4.6 | 64.32 | 3.72 |
8 | 50/0.45 | 0.8 | 5.3 | 93.07 | 2.45 |
Note: The "F" in the table indicates that the conductor is a soft structure |
Our products can meet UL, VDE, CCC, PSE certificate requirement and the products are accord with ROHS and REACH Halogen free standard.
Our factory could meet ISO9001:2008 management systems standard. There are 6 production lines in high quality, precise, automation which supporting daily capacity 300,000km cables at least.
Q1: Can I get a free sample?
A1: We can provide the existing items samples free in freight collected. If there is any special samples requirement, please contact us for more details.
Q2: How could I pay?
A2: We prefer T/T or L/C at sight. If you prefer other payment terms, please contact us freely.
Q3: What is your packing way? Can I have the customized package?
A3: We have the standard export package. For more details about the customized package, please contact us.
Q4: What is the delivery lead time?
A4: It depends on the order quantities. The mass production lead time is about 7-12 days after receipt of the deposit.
Q5: Are you a factory or a trading company?
A5: We are a factory. We provide all kinds of OEM/ODM services for clients around the world.
Q6: Where is your main market?
A6: We export to the North America, Southeast Asia, Europe, Korea, Japan, and other countries.
Our Services
1. Professional QC and QA team to make sure all products qualified before shipping.
2. Competitive price
3 .Standard package to ensure the safe transportation.
4. Professional service
Why choose us
1. Production
Qualified production, competitive price, professional service.
2. Technology
Professional R& D team
3. Equipment
With completive testing equipment.
4. Quality
UL/ CE/ FCC/ RoHS/ Reach certificate