China Goodeng pipeline crossing machine, Find details about China HDD Machine, Drilling Rig from Goodeng pipeline crossing machine
Engine Power | 93 kw | Max Torque | 4500 N·m |
Rig Weight | 4750 kg | Dimension(L*W*H) | 5465*1670*2040 mm |
Max. Push & Pull Force | 135 kN | Max Rotation Speed | 193 r/min |
Max. Push & Pull Speed | 36m/min | Max. Mud Pump Flow | 200 L/min |
Caterpillar Walking Speed | 2.5-4.5 km/h | Max. Mud Pump Pressure | 8 Mpa |
Enter Drill Angle | 12-22° | Max. Climbing Gradient | 16° |
Max. Aperture Diameter | Φ750 mm (Soil Depended) | Max. Crossing Length | 200 (Soil Depended) |
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:10-20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.