Keda Sinolinking Portable Gold Washing Machine Gold Recovery Plant

China Keda Sinolinking Portable Gold Washing Machine Gold Recovery Plant, Find details about China Diamond Wash Plant, Land Use Diamond Wash Plant from Keda Sinolinking Portable Gold Washing Machine Gold Recovery Plant

Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
Application
Gold or Diamond Separating
Capacity
1-25t/H
Feeding Size
<20mm
Driven
Motor
Keywords
Diamond Wash Plant
Processing Capacity
20-50t/H
Generator Power
30kw
Pump Power
7.5kw
Water Flow
90m3/H
Gold Chut with Carpet
1000*6000mm*1pic
Trommel Screen
1000*2000mm
Model
Kdtj-20
Dimension
5300*2000*2500mm
Trademark
KEDA
Transport Package
Container or Plywood Case
Specification
SGS, ISO
Origin
Qingzhou, Shandong
HS Code
847410000
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
Application
Gold or Diamond Separating
Capacity
1-25t/H
Feeding Size
<20mm
Driven
Motor
Keywords
Diamond Wash Plant
Processing Capacity
20-50t/H
Generator Power
30kw
Pump Power
7.5kw
Water Flow
90m3/H
Gold Chut with Carpet
1000*6000mm*1pic
Trommel Screen
1000*2000mm
Model
Kdtj-20
Dimension
5300*2000*2500mm
Trademark
KEDA
Transport Package
Container or Plywood Case
Specification
SGS, ISO
Origin
Qingzhou, Shandong
HS Code
847410000
 
Land or River Use Diamond Wash Mining Plant

1. Introduction

Keda supply Gemstone Mining Separator including land type and river type.
Land Use:
Tromel + Jigging Machine
River Use:
Dredger (+Trommel )+ Jigging Machine

Keda Jigging machine deal with almost full sizes of mineral materials and very fine material. It can achieve a good result in processing such as placer gold, diamond, tantalum-niobium, titanium, tungsten, iron, tin, hematite, cope, manganese, barite, zirconium and chrome etc. Especially good effect at alluvial gold and diamond recovery.
Keda Sinolinking Portable Gold Washing Machine Gold Recovery Plant


2. Parameter of Jig Separator
ItemSpecification
ModelJT-0.57JT1-1JT2-2JT3-1JT4-2JT5-2
Jig roomL*W(mm)450-750*950450-900*15001070*1070960-2000*
1950
1510*15101200-2000*
3150
Stroke Coefficient0.570.640.4510.58
 
0.58
Max Approved grain size(mm)6mm5mm10mm<20mm8mm8mm
Working Capacity(t/h)1-2.52-34-810-1512-1620-25
Water Consumption
(m/h)
1-22-32-43-64-85-10
DiaphragmStroke(mm)(Detailed data can supply)
 Stroke frequency (min)(Detailed data can supply)
MotorPower(KW)1.52.235.57.57.5
Dimension(L*W*H)(mm)1530*780*15502060*1112*18902870*1520*18802662*2000*30304240*1990*27503940*2006*2580
Weight(kg)6129891637326035003854


3. Pictures and Video
Pictures
http://kedagoldmining.en.made-in-china.com

Video
Keda Gold+Diamond Working Line
https://kedagoldmining.en.made-in-china.com



4. Important information if you are looking Diamond Wash Plant


1). In mining material, clay content and stone size.
2). Max. gemstone or diamond size?
3). The capacity you expect for, how t/h.

We will help you find the suitable Diamond Wash Plant via your information.

 


Other Equipment--
Gold Mining Equipment
Cutter Suction Dredger
Keda Sinolinking Portable Gold Washing Machine Gold Recovery Plant

Sand Wash Line