Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out

China Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out, Find details about China Shrink Tunnel, Tunnel from Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out

Model NO.
TG-500A
Structure
Pallet Wrapping Machine
Film Frame Structure
Mechanical Stretch
Series
NT Series - No Pallet Wrapping Machine
Tunnel Belt
SUS304
Trademark
tango
Transport Package
Wooden Case
Specification
CE SGS ISO
Origin
Zhangjiagang
HS Code
8422301090
Model NO.
TG-500A
Structure
Pallet Wrapping Machine
Film Frame Structure
Mechanical Stretch
Series
NT Series - No Pallet Wrapping Machine
Tunnel Belt
SUS304
Trademark
tango
Transport Package
Wooden Case
Specification
CE SGS ISO
Origin
Zhangjiagang
HS Code
8422301090
      Product description:           

  Shrink packing tunnel
Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out
Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out
Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out
Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out



Technical data:

 
External size: L3700× W920× H1800mm
Max. Packing size: L600× W400× H350mm
Shrinkage film: PE, PVC, POF
Shrinkage film thickness: 0.03-0.15mm
Thermo shrinkage tunnel temperature: 160 - 260° Can adjust at will
Max output per minute: 0-10bags
Facility power: 18Kw
Actual power: 15Kw/h
Voltage requirement: 380/220V
Facility weight: 0.6T
Fan: 1.1Kw 2units 380V, 65W 4units 380V
Two, Facility basical configuration:
Taiwan Telta frequency converter 1set
Stainless iron wing type heating tube 12 pieces
China-America cooperation Teflon convey belt.
Shanghai Hemei electric-motor and Zhejiang Taili worm speed transmission.
Whole machine outter plastic-sprayed, the frame is made of high-quality carbon steel.

Three, Product descripition:

Double-wind recyle fan machine, ensure the temperature in shrinkage tunnel evenly.
Super wind-volume cooling system, ensure get into shape quickly.
Anti-high temperature teflon convey belt, convey steadily, high-strength anti-abrasion.
Frequency unlimited speed adjustment and belt convey structure.
Wing type stainless iron heating system, endurance used.

Technical condition and requirement:

1, Packing method( Just for your reference):

(1) 350/500/550/600ML: Large package: 4× 6, 4× 5;
Small package: 3× 4, 3× 5 four type of package method.

(2) 1L/1.5L/2L/2.5L: Large package: 3× 3, 3× 4;
Small package: 2× 2, 2× 3 four type of package.

2, Regarding can package, we suggest adopt to package with tray, pack steadily.

3, Package speed: 5-12bags/min

4, Package material: PE thermo shrinkage film width(200-600mm), thickness(0.08-0.12mm)

20pack/m  capacity type
Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out
I, Technical parameter: 

Facility overall size: L12000*W1100*H2100mm
Facility overall size: Main equipment: L12000× W1100× H2100mm
Shrinkage machine: 4200× 1100× 1700mm
Wrap max size: L240× W650× H450mm
Shrinkage film material: PE
Shrinkage film thickenss: 0.03-0.15mm
Thermo shrinkage tunnel max temperature: 160 - 260° Adjust at will
Max output per minute: 20 pack/minute
Facility power: 25Kw
Actual power: 20Kw/h


Ii, Facility basic collocation:

OMRON: PLC controlling system
WEINVIEW: Touch Screen
Taiwan Airtac pneumatic component 1set
Taiwan Telta transducer 2set
Stainless steel wing heating tube 12PCS
China-USA cooperation Teflon convey belt.
Shanghai HEMEI motor and Zhenjiang Taili worm derailleur.
South Korea Autonics photoelectrical switch, approach witch
Thermo sealing knife aluminum casting heating board, even temperature, long usage life,
Our company special production
Whole machine appearance plastic spray, machine rack adopt to high-quality carbonated steel, main part adopt to stainless steel.
Wooden case and wrap film separate package.

Technical requirement:

1, Package type:


(1)350/500/550/600ml big bag: 4*6, 4*5; Small bag, 3× 4, 3× 5 four type of package.

(2)1L/1.5L/2L/2.5L big bag: 3*3, 3*4; Small bag, 2× 2, 2× 3 four type f package

2, Regarding can, we suggest adopt to package with tray, pack steadily.

3, Package speed: 16-20bag/min

4, Meet with pre-treatment filling speed of filling machine.

(1) 350/500/550/600ml
big bag: 4*6, 4*5, (24000-29000b/h),

Small bag: 3*5, 3*4, (15000-18000b/h).

(2)1L/1.5L/2L

big bag: 3× 4, 3× 3(10000-14000b/hour),

Small bag: 2× 3, 2× 2(5000-7000b/hour).

5, Package material:

PE thermo shrinkage film width(200-600mm), Thickness(0.03-0.12mm)

 
 
Main component detail list

 
noNamespecificationnumberbrand
1board production component   
2 Plant metal component   
3pneumatic component 1SMC
4Electric controlling component and accessory
 Photoelectric switch 1South Korea Autonics
    Proximity switch 4South Korea Autonics
PLC 1OMRON
Touch screen 1WEINVIEW
Frequency converter  2Taiwan Telta
AC contactor 9France Schneider
Mid-relay 12France Schneider





Loading list
 
 NONameModelNumberRemark
1Automatic film wrappage machine  1 set 
2Bottle convey machine  1 set 
3Thermo shrinkage package machine  1 set 
4Convey machine rack  1 set 
5Wing heating tube Stainless iron2 piece 
6Thermo-sealing cutting  1 unit 
7Pressed rubber  1 set 
8AC contactor  1 unit 
9Middle relay  2 units 
10High temperature fabric  1 pieceStainless steel
11Film for machine testing  2 rolls 
12Thermo-couple  1 piece 
13Tools  1 set 
14Temperature control meter instruction       
15Frequency converter instruction  1 piece 
16Operation use instruction  1piece 
                              
               
Shrink Packing Tunnel for PE Film Wrapping with SUS Belt Avoid Belt Wear out
20pack/minute type linear wrapping machine with pad feeding


container loading photos



Carton film wrapping fracture:


shrink wrapping machine for carton film wrapping and shrink  with bend roll conveyor

Term and condition:
1. Payment
30% deposit against the contract by T/T should be paid before the order;
70% balance should be paid off by T/T after inspection before delivery;

2. Delivery time 
60 days after received the down payment;

3. Training
Against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;

4. Installation and adjustment 
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's visa application cost, round air tickets, food & board before his departure; And pay USD 80/day to engineer.

5. Guarantee
one year

Competitive Advantages
Well and High Quality Control , 
Prompt Delivery ,long term testing before delivery
improve new technology all time
Customer's Design and Logo are Welcome , 
Competitive Prices , 
Earth-friendly Products , 
In a Variety of Design , 
Small Order Acceptable , 
ODM Accepted , 
OEM Accepted .


High quality: international brand electricity and good material
Our machines are using world famous brand component.
MITSUBISH PLC variable-frequency governor and OMRON optical switch form Japan.
SCHNEIDER electrical appliance components from France and Germany.
LG air switch,contactor and circuit breaker from South Korea.
SEMIKRON control thyristors from Germany.
BOURNS potentiometer from America.

Professional After Sale Service
Our engineer will be on site to guide installation and debugging , we also provide free staff training. Further more,Our After Sale service department offering 24 hours 7days service ,we will quickly respond you once you have any question when using our machines.

Long history of the Company
Our company is famous for its finest quality and enjoys a long-standing reputation at home and abroad. Having a long history of more than two decades,great experience accumulated in such a long time making us on the top list of Chinese company.


For more:
  
phone:+8613739169728
Facebook:tangomachine
Tingtangosophie-twitter