

Lifting table with separate hydraulic station as the driven force, foot switch for up and down by operator. Technical parameterPower supply | 3P 380V 50HZ |
Total power | 1.5 kw |
Platform size | 450×4000mm or customized |
Max. height of platform | 1035mm |




Mostly asked questions below:1. What is your soonest lead time? A: 60 days for whole production line, 30 days for single machine. Special requirement pls check with sales.
2. How do you arrange the shipment? A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.
3. Guarantee ? A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.
4. How we can install the machines? A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.
5. How about the after service? A: Spare parts within 72 hours.
Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.