Galvanized Q355 Steel Electric Transmission Tower Power Tower

China Galvanized Q355 Steel Electric Transmission Tower Power Tower, Find details about China Electric Transmission Tower, Galvanized Q355 Steel Electric Tower from Galvanized Q355 Steel Electric Transmission Tower Power Tower

Model NO.
DFBDT03
Grade
Q355
Trademark
DFBD
Transport Package
Bundle
Specification
as drawings
Origin
Tangshan, China
HS Code
73082000
Model NO.
DFBDT03
Grade
Q355
Trademark
DFBD
Transport Package
Bundle
Specification
as drawings
Origin
Tangshan, China
HS Code
73082000
Galvanized Q355 Steel Electric Transmission Tower Power Tower
Product Description




 
roduct Name:Galvanized Q355 Steel Electric Transmission Tower  Power Tower
Material:steel
Surface Treatment:Hot dip galvanized/Black
Size:OEM Customized
Processing:Stamping/Punching/Bending/Tapping/Milling/Lathe/Welding/Assembly/Laser cutting
Grade:Q235/Q355
Certification:ISO9001,SGS,CTI,ROHS
Industry:Utilities,Power,Overhead construction,Pole line hardware,Line fitting
Country of origin:China

 
 

Tower Types:
1. 3 Leg Self supported Angular Towers

2. 3 Leg Self supported Tubular Towers

3. 4 Leg Self supported Angular Towers

4. 4 Leg Self supported Tubular Towers

5. Guyed Mast

6. Monopole Tower

7. Camouflaged Tower: Palm Tree, Pine Tree, Coconut and others tree

8. RDS Tower: Rapid Deploy Site/Tower

9. Rooftop Towers

10. Smart Poles


Features:
1.strong wind resistance.
Small coefficient of wind load,
2.Save land resource, convenient location.
3.Convenient transportation and installation.

Workshop
Galvanized Q355 Steel Electric Transmission Tower Power Tower
Products Show
Galvanized Q355 Steel Electric Transmission Tower Power Tower
FAQ:
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: