Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300

China Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300, Find details about China Coke, Foundry Coke from Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300

Model NO.
safee-910
Type
Foundry Coke
Trademark
SAFEE
Transport Package
Plastic Bag
Specification
Metallurgical Coke
Origin
Shanxi, China (Mainland)
HS Code
2704001000
Model NO.
safee-910
Type
Foundry Coke
Trademark
SAFEE
Transport Package
Plastic Bag
Specification
Metallurgical Coke
Origin
Shanxi, China (Mainland)
HS Code
2704001000
Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300
Guarantee:
Price concessions, quality standards, and thoughtful service
Quick Detail
Place of Originshandong,China(Mainland)Type  FoundryCokeCalory(J)7200
Sulphur content(%)0.5Ash Content(%)12Fixed Carbon(%)90
Moisture(%)2.78Phosphours content0.03Volatile Matter(%)1.5
Abrasive Resistance7Crushing Strength82Brand NameOEM
Model Number100-180mmApplication:for casting and smelting steelUsage:Steel Making
Dimensions:Customers OptionColorblackHS CODE27040010
ShapeLump    
Packing Detailesin ton bag or loose in container    
portQingdao     
Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300
Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300
Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300
Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300


Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300
Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300
Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300
Metallurgical Coke 30-80mm FC88 Coke Calory (J) 7300


hard coke for pakistan market 

Foundry&Metallurgical Coke

fixed carbon:85,86%,87%,88%,90%    

sulfur:0.5%,0.6%max,0.65%max,0.7%max,0.8%max

ash:8% 10%,11%,12%,12.5%,13%,13.5%

volatile matter:1%,1.5%,2%

moisture:4%,4.5%,5%

calories:6800~7800KCal

size:regular size:25-300mm,or as customer's requirement

Packaging & Shipping
Packaging Details: 1.jumbo ton bag 2. 50kg pp bag in ton bag 3. in bulk or loose inside container 4. as the customers' requirements
Delivery Detail: 15 days after we get the advanced payment or original L/C