Water Turbine Generator 50kw Turbina Generator Hydropower Francis Turbine

China Water Turbine Generator 50kw Turbina Generator Hydropower Francis Turbine, Find details about China Water Turbine Generator 50kw, Water Turbin Generator Hydropower from Water Turbine Generator 50kw Turbina Generator Hydropower Francis Turbine

Model NO.
ZD103-LM
Standard
Standard
Design Head
13m to 17m
Design Flow
3.83 M3/S To9.27 M/S
Generator
3-Phase Alternator
Trademark
Forster
Transport Package
Wood Box
Specification
OEM
Origin
Sichuan, China
HS Code
8410110000
Model NO.
ZD103-LM
Standard
Standard
Design Head
13m to 17m
Design Flow
3.83 M3/S To9.27 M/S
Generator
3-Phase Alternator
Trademark
Forster
Transport Package
Wood Box
Specification
OEM
Origin
Sichuan, China
HS Code
8410110000

1 MW Hydro Generator Water Turbine With Competitive Price

Our kaplan turbine can be blade fixed model and balde adjustable model, and it has equipped governor that makes cusomter able to control the power and speed on contorl panel. The efficiency of our kaplan turbine could reach 97% and it can be off-grid and on-grid running, the control system is full automatic. 

Kaplan turbine has below advantages:
1. Suitable for develop low head large flow rate hydro power.
2. Could be running steadily in changable flow
3. Kaplan turbine is a vetical model, economic and easy to maintain.

Kaplan Hydro Turbine Product Parameters:

 ZD-LM(Y)-Kaplan tubine generator unitGeneratorGevernor or Regulating work
Turbine
TypeBlade angle(°)Water head(m)Discharge (m³/s)Speed (r/min)Power(kw)Efficiency(%)
Zd500- LM ( Y )-100+5.13.5  4.6150053788SF500-12/1180 SF630-12/1180 SF800-10/1180 SF1000-10/1180YT6000
174.58672
16.55.48875YWT-10000
22.55.456001059
+10°11.14.61428.643787SF400-14/1180YT6000
13.54.67538SF500-14/1180
14.95.43500690SF630-12/1430YWT-10000
18,95.37867SF800-12/1430
19.66.496001085SF1000-10/1730
+15°125.36428 654486.2$F500-14/1t80YT6000
14.85.3767886.9SF630-14/1430
16.36.2250086687SF800-12/1430YWT-10000
Zd1500-LM (Y )-120-5133.8337543388.6SF400-16/1730YT6000
15.63.99428.6542 SF500-16/1730YWT-10000
17.24.53678 SF630-14/1730
19.55.1150086688.7SF800-12/1730
245.191083 SF1000-10/1730
25.56.14134687.7SF1250-10/1730
+0°13.14.7537554288.7SF500-16/1730YT-6000
14.55.33428.667889.5SF630-14/1730YWT-10000
18.45.4872SF800-14/1730
19.66.335001089SF1000-12/1730
24.26.41359SF1250-12/1730
+5°13.4637569988.7SF630-16/1730YWT-6000
14.86.76428.6871SF800-14/1730
16.66.741091SF1000-14/1730YWT-10000
19.585001357SF1250-12/1730
10°11.96.6437570288SF630-16/1730YWT-10000
14.76.96883SF800-16/1730
167.89428.61090SF1000-14/2150YWT-18000
19.58.051355SF125O-14/2150
15°12.78.0337588088SF800-16/2150YWT-10000
15.28.2108889SF1000-16/2150
16.99.27 135288SF1250-14/2150YWT-18000

Company Information

Water Turbine Generator 50kw Turbina Generator Hydropower Francis Turbine
Our workshop
Water Turbine Generator 50kw Turbina Generator Hydropower Francis Turbine


FAQ

Q1, Which turbine should I choose?
 Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation, 

Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment,upgrade, improvement, repair,refurbishment of turbines,generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?
 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.   

website address: cdforster.en.made-in-china.com
Water Turbine Generator 50kw Turbina Generator Hydropower Francis Turbine