Description of BW250 piston mud pump:
BW250 Triplex Mud Pump:
Be sure that the pump foundation is level and able to support the weight of the pump.
2. Install the pump as close as possible to the mud tank or pit to reduce drop in suction line.
SUCTION SYSTEM
The diameter of the suction line must be equal to or exceed the diameter of the pump suction connection.
Use as short a suction line as possible.
3. Install the suction line in as straight a line possible. If turns are necessary use long radius ells. 4. Install a section hose in the suction line to isolate vibration.
5. Be sure there are no air traps or air leaks in the suction line.
6. Install a charging pump in the suction line. (See CHARGING PUMPS.)
7. Install a suction desurger to prevent mud cavitation. (Refer to FLUID END ACCESSORIES in Section 4 of this guide.)
8. Fully open all valves in the suction line before operating the pump.
Tips for PREPARATION:
If the pump was not completely assembled at the factory, complete the assembly as required.
2. Check to be sure the suction and discharge systems have been properly installed. (SEE INSTALLATION)
3. Remove the cover plates from the power end.
4. Inspect the power end for contamination. Clean as required.
5. Drain all condensation from the power frame (Figure 1-4). Fig. 1-4 Power end drain plug Do not attempt to drain condensation from power frame if unit has been filled with lubricant. (why?)
6. Install cover plates.
7. Check that crankcase drain plug is installed and tight. 8. Fill the power end with correct lubricant.
parameters:
Maximum flow rate | 250L/min |
Maximum pressure | 60kg/cm2 |
Motor power | 15kw |
The diameter of the suction pipe | 64mm |
Drain pipe diameter | 50mm |
Weight | 650kg |
FAQ:Q1: Are you factory or trade company?A1: We are factory. And we have ourselves trading company. Q2: What the exactly address of your factory?A2: No.27,Beichen Village Industrial Park, Weiyang District, Shaanxi Province China. Q3: Warranty terms of your machine?A3: One year warranty for the machine and technical support according to your needs.Q4: Will you provide some spare parts of the machines?A4: Yes, of course.Q5: What about the voltage of products? Can they be customized?A5: Our standard voltage is 380V, 50HZ, 3phase. The voltage can be customized according to your equirement. Q6: Which payment term can you accept?A6: 100% T/T( Decide according to actual situation)Q7: How long will you take to arrange production?A7: we can delivery the normal goods within 7-15 days. Other nonstandard electrical items we will delivery within 25-30 days. Q8: Can you accept OEM orders?A8: Yes, with professional design team, OEM orders are highly welcome. Q9: Which trade term can you accept?A9: Available trade terms: FOB, CIF, CFR, EXW, etc.Q10: Do you provide samples? Is it free or extra?A10: Yes, we could offer you the sample machine. But it's not free. You need to pay for the sample and the cost of freight.Q11: What is your terms of payment?A11: We accept T/T, Western Union, Money Gram, Paypal, L/C, etc. Our Company Information:
We have been focusing on high-quality mechanical equipment and construction products for more than 20 years. Especially have rich experience at mining equipment, main products include:Ultra Large Rock SplitterSubmersible Drilling RigSpraying MachineGrinding MachineAbout Our Factory:
About the products:
Packing and Shipping:
Purchase Process:
About the Quality:
Others:
Why you choose us:1. We are a real factory offering products and provide free technical advice.
2. Company in business for many years and served Over 50 countries customers.
3. All machine with CE, ISO,SGS certificate. Machine and spindle warranty 1 year.
4. We have phone support in English, if you have any questions, you can call us, and we can give you the best solution within 24 hours.
5. Fast delivery, save your time.