Equipment Characteristics
1. the inner tank: mirror polishing (Ra≤0.28μm).
2.head: the conical head, elliptical head or dished head,
3. jacket form: full jacket, semicircle coil jacket or honeycomb jacket.
4. insulation materials: filled with perlite, rockwool or polyurethane foam
5.mixing device: top center (partial) stirring or side stirring ;
6.mixing paddle form: frame, anchor, propulsion, paddle type, turbine type, etc..
7. mixing speed: 10 ~ 120r/min (fixed speed) or configuration stepless speed regulation and frequency speed regulation.
8 . liquid level meter: glass tube level gauge, static pressure sensor level gauge, ultrasonic level gauge, RF capacitance level meter, etc..
9. the foot : three pyramid form or round tube type.
10.equipment configuration: quick open manhole, mirror, light, thermometer (digital display or dial type), sampling hole, air breathing apparatus, CIP cleaner, material liquid inlet and outlet, spare hole, hot and cold medium inlet and outlet.
11. Material: inner tank SUS304 or SUS316L; jacket is Q235-B or SUS304; outer protection shell is SUS304.
12 .container sterilization method: Online steam sterilization (121 degrees C, 0.1MPa).
13. each inlet and outlet pipe, mirror, manhole and other technical hole and inner tank welding joints adopt flanging process, arc transition, smooth, easy to clean, no dead angle with good appearance.
14. some other non-standard features can be customized according to customer needs
Equipment description
Preparation tank is also known as mixing tank or blending tank.It is mainly used on dairy product or beverage production line to mix sugar, salt and other materials.It is indispensable equipment for dairy, beverage and pharmaceutical factory .
Working principle
Composed by main body tank cover, agitator.The inlet and outlet valve are made of imported stainless steel 1Cr18Ni9Ti and manufactured under technical conditions GB741-80.Inside of the tank is polished. At the top of the agitator, the planet-cycloid retarder can drive the agitator. The retarder can be assembled and disassembled and cleaned. Two covers can be opened and easily cleaned.The sloping bottom makes it easier to discharge material. Two inlets are connected with the pipeline for the continuous filling of material.Technical Parameters
Product Name | Blending tank |
Model | JPPP-001 |
Material | SUS304(or customized) |
Capacity | 50L-20000L |
Usage | Blending and stirring for dairy products and beverage |
Application | dairy, beverage and pharmaceutical factory |
About Us:
Our company is the first company to manufacture complete food&beverage processing line in China and we are keeping leadership position in the fruit&vegetable processing line for 30 years since 1986 when China introduce technique from Italy/German and start to manufacture.Till now, we have set up over 110 factories for our customers in domestic and oversea market.
We has independent intellectual property rights of several equipment, including: large vacuum evaporation concentrating equipment (1000L-60000L/H), large sterilization equipment (tube and tube in tube type 1T/H-50T/H), large drying equipment (water evaporation quantity 100-10000T/H), aseptic filling equipment, and many advanced pre-treatment equipment for different fruits. Among them, the concentrated equipment for juice and jam, with its high performance and ultra-low temperature , has gained high reputation in this industry; And large tube-in-tube sterilization equipment have gain major breakthrough in energy saving, saving 30% energy compared with the industry standard, which has owned the national patent (Patent No.: ZL 201120565107.2); Various types of advanced juicing and beating equipment have been ranking first for continuous 7 years regarding their quality and sales volume.
Thoughtful After-sale services:
1). We make accurate factory layout design according to customer's factory size; if the customer needed, we could make workshop design.
2). After receiving firm order and down payment, we start to apply for the Visa to your country immediately; while the machines arrives your factory, our engineers are ready to start for the commissioning service.
3). 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4). Our engineers have responsibility to teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5). Our engineers can provide basic formula for the production, and help the customer to produce good quality food according customer's detailed formula
6). It normally costs 10-14 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
Contact Us:
To get more information of tomato paste production line, please feel free to contact our engineer:
Dr. May Feng
Mob./ Wap: 008615901792807