China Incinerator Manufacturers, Animal Carcasses Cremation Incineration, Find details about China Incinerator Manufacturers, Waste Incinerator from Incinerator Manufacturers, Animal Carcasses Cremation Incineration
Model | WFS-30 | WFS-50 | WFS-150 | WFS-300 | WFS-500 |
Burning capacity | 20-30kg/time | 30-50kg/time | 100-150kg/time | 200-300kg/time | 300-500kg/time |
Incinerator Size m (L*H*B) | 1.45*0.9*1.75 | 1.8*1.15*3 | 2*1.4*3.5 | 2.2*1.4*3.8 | 3*2*4.8 |
Imputing mouth width (mm) | 480*600 | 620*800 | 760*960 | 900*1100 | 1080*1280 |
Chimney external diameter (mm) | 280 | 280 | 300 | 400 | 460 |
Draught fan | 0.37w | 0.37w | 0.5w | 1.1kw | 1.1kw/0.55kw |
Combustion improver device | 0.11kw Oil consumption:4-6kg/h | 0.11kw Oil consumption:4-10kg/h | 0.11kw Oil consumption:4-10kg/h | 0.22kw Oil consumption:7-14kg/h | 0.22kw Oil consumption:7-14kg/h |
Re-burning device | 0.11 kw Oil consumption 4-6 kg/h | 0.11kw Oil consumption:4-10kg/h | 0.22kw Oil consumption:7-14kg/h | 0.37kw Oil consumption:10-20kg/h | 0.22kw Oil consumption:15-26kg/h |
Voltage | 380v/220v | 380v/220v | 380v/220v | 380v/220v | 380v/220v |
Weight(kg) | 2300 | 4000 | 7000 | 8000 | 13000 |
1.Q:Are you a factory or trading company
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
A: Our factory is located in No. 1137, Zhucheng City, Shandong Province,China. It is about 2 hours from Qingdao airport, Qingdao Train station and Weifang train station. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ISO,SGS certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water or waste sources, water or waste quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Welcome to contact us 24 hous 7 days