China 1/2" F1807 Pex Tee Copper Water Hammer Arrestor Lead Free Chrome Plated, Find details about China Upc &Cupc Certified, Asni/Asse 1010-2004 Certified from 1/2" F1807 Pex Tee Copper Water Hammer Arrestor Lead Free Chrome Plated
Item No: FN-310-C-C
Function:
1.Water hammer arrestors control the destructive shock of water hammer and reduce pressure in the piping system to safe levels
2.Prevents banging noise to pipes and appliances caused by water pressure shock
3.Water Hammer Arrestors are used in light commercial and residential applications
Material | Lead Free Brass |
Certification | ASNI/ASSE 1010-2004 Certified and cUPC Listed |
Dimention | 1/2" MNPT ,3/4"MNPT ,1"MNPT |
Temperature Range | 33F to 180F |
MOQ | 500 Pcs |
1.Samples Delivery Time
Two days - our existing samples
10-15 days - If new sample development
2.Shipment Delivery Time: 25-35 days after confirming the order
3.Production Capacity :200000 pcs each month,
4.Packing Details : One pc in white inner box ,then packed in master carton
5.Testing : Material Testing ,Hardness Testing ,Core Dimention Testing,Gauge Testing
6.Inspection: Each cargo will be inspected before shipping. The third-party inspection company is acceptable.
Q1:Are you a factory or trading company
A1:We are a factory produced brass products since 2009,
Q2:How does your factory do regarding quality control?
A2:All the products will be 100%inspection before the shipment.
Q3:When can I get the price?
A3:Usually we quote within 12 hours after we get your inquiry.
Q4:Do you provide samples ? ls it free or Extra?
A4:Yes ,we provide the sample free .
Q5: What is the MOQ ?
A5:500 pcs of each size .
Q6: What is the terms of business
A6:FOB/CNFICIF,All accepted ,Port include Ningbo /Shanghai both ok .
Q7:What is your payment terms ?
A7:TT payment ,30% deposit in advance ,and balance against of copy documents ,
Lc at sight .
Q8:What is the delivery time for the order ?
A8: It depends on the quantity ,we can ship within 1 week if we have stock ,if we do not have stock ,our standard delivery time will be 30-35days ,if some urgent goods ,we can speed up the production for earlier shipment.