China Sectional Unified Tension Adjusting Warper Warping Machine, Find details about China Warping Machine, Warping Machine Price from Sectional Unified Tension Adjusting Warper Warping Machine
Sectional Unified Tension Adjusting warper Warping Machine
Application: Workable for worsted fabric,trademark,strong twisted polyester filament fabric, dyed yarn fabric, silk, terry towel and special industrial fabric, can be equipped with water-jet,air-jet,rapier, projectile loom.
Main Technical Parameters:
Beam diameter(mm) | Φ800,Φ1000 |
Working width(mm) | 2300~5600 |
Drum taper | 1:6, 1:8 |
Drum taper length(mm) | 1150(Φ800); 1380(Φ1000,1:6); 1840(Φ1000,1:8 ) |
Max.beaming tension | 6000N |
Max.section width | 770mm |
Max.working speed | 500m/min |
Max.beaming speed | 150m/min(full beam) |
Tension measurement device | No |
Density measurement device | No |
Warping infrared protection | No |
Loading/unload control | Pneumatic |
Beaming tension control | Pressure regulating valve |
Tension frame control | Open-loop control |
24+: With 24 years of dedicated research and development of textile machinery, manufacturing, sales and service in one of the modern state-level high-tech enterprises.
3+: With 3 large-scale enterprises: Jiangyin Huafang New Technology&Scientific Reasearch Co.,Ltd, Jiangyin Huafang Intelligent Textile Machinery Co.,Ltd And Jiangyin Huafang International Trading Co.,Ltd.
5+: H-FANG provides perfect textile machinery technology solutions with 5 major categories.
350000000+: H-FANG produces over 300 sets of various textile machines and 2 million spindles of compact spinning every year, with annual sales about RMB 350 million. Main products both warping machine series has NO.1 market share in China.
1: What kind terms of payment can be accepted?
A: For the payment terms, L/C, T/T, D/A, D/P can be accepted.
2: What certificates are available in Machinery?
A: For the certificates, CE, ISO are available.
3: What about the delivery time?
A: 1-3 months after receiving advance payment.
4: What about the warranty time?
A: 12 months after shipment or 15 months after delivery, whichever occurs first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 set.