PV22 /23 Control Valve Sigle Side for Hydraulic Piston Pump

China PV22/23 Control Valve Sigle Side for Hydraulic Piston Pump, Find details about China Hydraulic Piston Pump, Hydraulic Motor from PV22/23 Control Valve Sigle Side for Hydraulic Piston Pump

Model NO.
PV22/23
Material
Carbon Steel
Type
Double Seater
Usage
Oil
Apply to
Excavator Construction Machinery
Trademark
Bonfiglioli
Transport Package
Box or Customer Requirements
Specification
A4VG28-71
Origin
China
HS Code
8412291000
Model NO.
PV22/23
Material
Carbon Steel
Type
Double Seater
Usage
Oil
Apply to
Excavator Construction Machinery
Trademark
Bonfiglioli
Transport Package
Box or Customer Requirements
Specification
A4VG28-71
Origin
China
HS Code
8412291000
Our Advantage
1. There are lots of available control valve in stock.
2. We are professional supplier of hydraulics.
3. Our factory has more than 10 years exprience in hydraulic industry.
4. Our factory is closed to Shanghai port & Ningbo port
main products

PV22/23 Control Valve Sigle Side for Hydraulic Piston Pump

Applied for
PV22/23 Control Valve Sigle Side for Hydraulic Piston Pump

PV22/23 Control Valve Sigle Side for Hydraulic Piston Pump



Packaging & Shipping
PV22/23 Control Valve Sigle Side for Hydraulic Piston Pump


PV22/23 Control Valve Sigle Side for Hydraulic Piston Pump

FAQ

Payment term:

1. T/T: 30% deposit by T/T, 70% balance by T/T before shipment

2. L/C at sight

Trade term: EXW or FOB Ningbo/Shanghai

Packing details:

Eternal Brand, Neutral or Customer's requires packing 

Neutral carton or same as the Customer's requires, export standard carton

All cartons should be packed into the pallets more carefully.

All of the productions are inspected carefully one by one by QC before delivery.

Delivery time:

We have huge quantity of inventory for complete pumps, motor and some pare pats, 
so the leading time is within 3days if have in stock. 
If haven't, within 5days if the quantity is less than 50pcs. 
It depends on the quantity ordered.

Min. Order:
If the model is in common or the production are in our stock warehouse, 
No MOQ for stocking production.Larger quantity, price will be more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It's door to door or barn to the door,
usually 5-7 days to arrive.

By air to air port, usually 3-5 days to arrive

By sea to sea port, usually 20-30 days to arrive.

If your deliever time is very urgent, we suggest that you choose by courier or air.

If not, it's very cheap to by sea.

CONTACT US