China Automatic High Speed Pouch Filling and Cartoning Machine in A Line, Find details about China Pouch Packing Machine, Pouch Cartoning Machine from Automatic High Speed Pouch Filling and Cartoning Machine in A Line
Machine Description:
The KXZ-280C high speed cartoner is a fully automatic cartoning machine which can run at high-speeds in a continuous mode. This packaging machine operates with high stability and pack 280 cartons per minute, which is 2-3 times faster than ordinary cartoners. Our machines are extremely efficient. Packaging is completed in a steady process, while the noise and load are minimized.
The cartoning machine adopts a suspended structural design. It has an innovative compact design with convenient maintenance access, allowing operators to get close to the equipment easily and clean or replace components. The suspended structure of the whole machine lets waste fall to the collection unit below, making it easy to keep clean. The whole machine is made of stainless steel and features a closed circuit and gas path structure. The driving device is located at the rear and is completely open on the operator side, which meets GMP standards.
Features:
Main Technical Parameters:
Packing Speed | 50-280 cartons/min | |
Carton specifications | Weight | 250-450g/m² (according to its dimensions) |
Dimension (L x W x H) | (100-250)mm×(60-130)mm×(20-70)mm (Special size can be customized) | |
Compressed air | Working pressure | ≥0.6Mpa |
Air consumption | 20m³/h | |
Power supply | 380V 50Hz | |
Motor power | 1.5kw | |
Overall dimension (LxWxH) | 5000 x 1700 x 1900mm | |
Machine weight | 2000KGS |
Product Sample:
Main parts list:
Item | Name | Model and specification | Origin | QTY |
1. | PLC | CPIE-N30DT-D | Japan Omron | 1 |
2. | PLC Extended Module | CPIE-C1F11 | 1 | |
3. | Touch Screen | NB7W-TWOOB | 1 | |
4. | Inverter | 3G3JZ-A4015 | 1 | |
5. | Photoelectric Sensor | SICK 121 | SICK | 4 |
6. | Servo motor | ECMA-20604RS 0.4KW | DELTA | 1 |
7. | Servo-drive | ASD-B2-0421-B | DELTA | 1 |
8. | Index Drive | 0S83-4L-180 | Zhejiang | 1 |
9. | Button | XB2 | France Schneider | 3 |
10. | Emergency Stop | ZB2 BC4D | 1 | |
11. | 5 relay | Zhejiang | 1 | |
12. | 8 transistor | 1 | ||
13. | Solenoid Valve | 4V210-08 | AirTAC | 2 |
14. | Air Filter/Regulator/ | BFR-2000 | 1 | |
15. | Proximity switch | TL-Q5MC1 | Japan Omron | 2 |
16. | Sucking disc | VF-30 | Korea | 2 |
17. | Vacuum Generator | ABM20-C | SMC | 1 |
18. | AC contactor | LC1E3210M5N | France Schneider | 1 |
19. | Switching power supply | PMC-24V 050V | DELTA | 1 |
20. | Air switch | 3P32A 1P10A | France Schneider | Each1 |
21. | Encoder | B-ZSP3806E2C | Japan Omron | 1 |
22. | Cover | Stainless Steel | Shanghai | 1 SET |
Company Information:
Packing & Shipping:
FAQ:
1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
2. How many days will you finish installing ?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa , air tickets, hotel, food ,and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machines have one year guarantee, starting from finished installation.
5. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for our technician 80USD/day.
6. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
7. Does your engineer understand English?
Our engineer understand a little English. All our engineers have more than five years machine installation experience. In addition, they can use body language to communicate with customer.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem, you can contact with our sales at any time. Our engineer will take a solution video according your description.
10. How many worker do we need running those machines?
Usually two or three people is ok. If it is manual feeding, more people are needed, mainly according to your production capacity.