Lianggong Platform Formwork for Elevator Contruction

China Lianggong Platform Formwork for Elevator Contruction, Find details about China Loading Platform, Light Platform from Lianggong Platform Formwork for Elevator Contruction

Model NO.
Shaft beam platform
Certificate
ISO9001
Trademark
LIANGGONG
Transport Package
Standard Package
Specification
Customized
Origin
China
Model NO.
Shaft beam platform
Certificate
ISO9001
Trademark
LIANGGONG
Transport Package
Standard Package
Specification
Customized
Origin
China

Product Description

Shaft  Beam Platform 

Shaft platform is mainly used for concrete casting of shaft of high-rise buildings, such as elevator, equipment shaft and stairwell. The lateral pressure of concrete is mainly borne by the wall-through tie rod, and the shaft beam platform has the advantages of being simple, quick and economic in operation.

Lianggong Platform Formwork for Elevator Contruction

Introduce to the system
Shaft beam platform consists of platform board, timber beam, clamp, shaft beam and anchor.

The structure drawing is as follows:

Lianggong Platform Formwork for Elevator Contruction


In the drawing, L is the length of timber beam and W is adjustable. Shaft beams are in a few specifications, ranging from 1.45m to 5.8m, being adapted to widths of different shafts, and selected as per need.


Lianggong Platform Formwork for Elevator Contruction
 
TypeSpecificationWeight
Shaft beam11.45-1.7m74.54
Shaft beam21.7-2.1m88.68
Shaft beam32.1-2.7m120.43
Shaft beam42.7-3.8m179.19
Shaft beam53.8-5.9m301.87

Shaft beam platform lifting
The platform and formwork must be hoisted separately. First, lift the formwork, and then the platform. When the platform is in place, the claw of the shaft beam must be fixed tightly on the tensile bolt.
Lianggong Platform Formwork for Elevator Contruction
Used together with the climbing formwork

The shaft beam platform should be used with other formwork system in construction process. The picture on the below is the diagram of collaboration of shaft beam platform and cantilever formwork CB-240.
Lianggong Platform Formwork for Elevator Contruction
 
Products Show
Lianggong Platform Formwork for Elevator Contruction
Lianggong Platform Formwork for Elevator Contruction
Characteristics
1.The length of shaft beam is adjustable.
2.stable in structure and convenient in operation. Connecting parts are standard and universal.
3.Supports, formwork and construction load are all born by anchors. No scaffold is needed. It is suitable for casting high-rise cores.
4.Variety in specification and adjustability of length of the platform beam are adapted to structural      dimensions of the shaft.
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Lianggong Platform Formwork for Elevator Contruction
 
Our Company
Lianggong Platform Formwork for Elevator Contruction
Lianggong Platform Formwork for Elevator Contruction
Customer Photos
 
Lianggong Platform Formwork for Elevator Contruction
Lianggong Platform Formwork for Elevator Contruction

FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term?
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !