En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe

China En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe, Find details about China Carbon Steel Pipe, ERW Welded Steel Pipe from En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe

out Diameter
10.3--3100mm
Wall Thickness
0.4--40mm
Length
5.8~12m or Upon Customer′ Requirements
Inspection
The Third Party Inspect
Standard
GB/T 3091, GB/T 13793, ASTM A252, ASTM A53, ASTM a
Grade
Ss400, Q235, Q345, Q460, A572 Gr.50, Gr.1/Gr.2/Gr.
Shipping Port
Tianjin,Qingdao,Shanghai
Payment Term
Tt30% Deposil+70% Balance Before Shipment
Finish
Hot Rolled/Cold Rolled
Trademark
as customer"s request
Transport Package
Bundle
Origin
Liaocheng, Shandong, China
out Diameter
10.3--3100mm
Wall Thickness
0.4--40mm
Length
5.8~12m or Upon Customer′ Requirements
Inspection
The Third Party Inspect
Standard
GB/T 3091, GB/T 13793, ASTM A252, ASTM A53, ASTM a
Grade
Ss400, Q235, Q345, Q460, A572 Gr.50, Gr.1/Gr.2/Gr.
Shipping Port
Tianjin,Qingdao,Shanghai
Payment Term
Tt30% Deposil+70% Balance Before Shipment
Finish
Hot Rolled/Cold Rolled
Trademark
as customer"s request
Transport Package
Bundle
Origin
Liaocheng, Shandong, China
En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe

Product Description

CommodityEN 10210 EN 10219 S235/ 275/ 355 ERW steel pipe
Outer diameterERW / HFWLSAW / DSAWSSAW / HSAWRHSSHS
1/8 - 20 inch
(10.3 - 508 mm)
12 - 56 inch
(323.8 - 1,420 mm)
8 - 126 inch
(219.1 - 3,200 mm)
40 x 20 mm -
1,000 x 800 mm
15 x 15 mm -
1,000 × 1,000 mm
Wall thickness0.4 - 16 mm6.0 - 40 mm6.0 - 26 mm1.0 - 30 mm0.6 - 30 mm
Length5.8 ~ 12.0 m or upon customers' requirements
StandardGB/T 3091, GB/T 13793, ASTM A252, ASTM A53, ASTM A500, EN 10210, EN 10219, API 5L, DIN 1626/1615, DIN 17120, etc.
GradeSS400, Q235, Q345, Q460, A572 Gr.50, Gr.1/Gr.2/Gr.3, S235, S275, S355, Grade A/B, X42, X52, X60, X70, etc.
SurfacePrime quality (bared, oiled, color paint, 3LPE, or other anti-corrosive treatment)
InspectionWith Chemical Composition and Mechanical Properties Analysis;
Dimensional and Visual Inspection, also with Nondestructive Inspection.
Applicationstructure, electric power transmission tower projects, piling, water, oil & gas pipeline engineering, mechanical industry, municipal projects, roads and its auxiliary facilities, etc.
PackingStandard export, in bulk / bundles / nylon fabric bags with seaworthy packing;
or according to customers' requestments.
Delivery Time1. 20-45 days after received deposit or confirmed L/C
2. Depends on your oder quantity
Payment Terms1. T/T: 30% T/T advance, 70% balance copy of  B/L
2. L/C: at sight
3. T/T and L/C: 30% T/T advance, 70% L/C
PortChina main port

Detailed Photos

En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe
En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe

 

En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe
En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe
En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe
En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe

 

En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe
En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe

 

En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe
En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe

Packaging & Shipping

En 10210 En 10219 S235/ 275/ 355 ERW Steel Pipe

After Sales Service

---------Before-Sale Service----------------

1.ISO Verified Outstanding Manufacture
2.The third party inspection:SGS,BV,CICC,ITS,CTI or according to the customer's requirements
3.Flexible Payment:T/T,L/C,DP
4.Quick Delivery time
5.Tracking picture or transport: production and loading pictures
6.Rich experience:Professional Sale Team


----------After-Sale Service-------------------

1.Quality Guarantee After Receiving the goods:Offer money return or ship new products for free if any problems happen
2.Technical guidance for further processing
3.VIP service and Discount after accumulated order quantity

FAQ

FAQ

1.How to get free samples?

 Send your address,your telephone number,post code,and express account number to our mail box,and told us which samples you need and samples specification.

2.Can you produce products with my own brand?

Yes,we can offer OEM services.

3.Do you have any international certificate?

Yes,we have API,  ISO and etc.

4.How long does my order take to be delivered?

It usually takes 5 to 30 days,which generally depends on the quantity of your order and our storage.