Injection Moulding Plastic Parts Water Flow Meter

China Injection Moulding Plastic Parts Water Flow Meter, Find details about China Plastic Parts, Plastic Product from Injection Moulding Plastic Parts Water Flow Meter

Model NO.
PRE-0265
Runner
Hot Runner
Design Software
UG
Installation
Semi Fixed
Certification
TS16949, CE, ISO, FDA
Standard
HASCO
Customized
Customized
Finish/Surface
Machined Surface or Mirror Surface
Tolerance
±0.001-0.2mm
Processing Method
Injection Molding
Surface Roughness
Ra 0.02-Ra 1.6
Color
Customized Color
Lead Time
1-10 Days
Processing Time
Various
Trademark
PRE
Transport Package
Customized Carton
Specification
35cm*35cm*35cm
Origin
China
HS Code
8538900000
Model NO.
PRE-0265
Runner
Hot Runner
Design Software
UG
Installation
Semi Fixed
Certification
TS16949, CE, ISO, FDA
Standard
HASCO
Customized
Customized
Finish/Surface
Machined Surface or Mirror Surface
Tolerance
±0.001-0.2mm
Processing Method
Injection Molding
Surface Roughness
Ra 0.02-Ra 1.6
Color
Customized Color
Lead Time
1-10 Days
Processing Time
Various
Trademark
PRE
Transport Package
Customized Carton
Specification
35cm*35cm*35cm
Origin
China
HS Code
8538900000
 Injection Moulding Plastic Parts Water Flow Meter
Product Description
 
Product Name:Plastic Parts
Manufacture Process:Design-Injection Molding-Inspecting-Packing
Plastic Raw Material:PA,PB,PC,PP,PPS,PE,PU,PEEK,POM,ABS,HDPE,PVC,PA6,PA66,LDPE,etc.
Plastic Packing Material:Filling masterbatch, coloring masterbatch, flame retardant masterbatch, antistatic masterbatch, smooth masterbatch, weather resistant masterbatch, packing masterbatch,etc.
Plastic Auxiliary Material:Plasticizer, heat stabilizer, light stabilizer, antioxidant, lubricant, coupling agent, filler, impact inhibitor, processing modifier, phase BAI, flame retardant, crosslinking agent, foaming agent,etc.
Mold Material:P20,H13,718,S50C,NAK80,S136,738,738H,SKD61,etc.
Color:Customized Color
Finish:IMD,Painting,NCVM,Plating,Laser,Matte,Mirror,Light,Semi-matte,etc.
Production Equipment:Injection Molding Machine
Processing time per piece:Various
Measuring Instruments and Equipment:1) Micrometer
2) Smooth plug gauge
3) Thread gauge
4) Image measuring instrument
5) Coordinate Measuring Machine
6) Roughness tester
7) Routine inspection of calipers
Tolerance:± 0.005~0.100 mm
Quality control:ISO 9001:2008 & IATF 16949
Sample time:1-3 days
Service:Customized OEM
Shipment:Fedex, DHL, UPS, Sea or Air Shipment, etc.
One-stop Service:Custom Design, Fabrication, Assembly And Delivery
File Format:Solidworks,Pro/Engineer,Auto CAD,C4D,Creo,PDF,JPG,DXF,IGS,STEP,DWG


Production Process
Injection Moulding Plastic Parts Water Flow Meter

About Us



Injection Moulding Plastic Parts Water Flow MeterInjection Moulding Plastic Parts Water Flow Meter
Injection Moulding Plastic Parts Water Flow Meter

Injection Moulding Plastic Parts Water Flow Meter

 

Packaging & Shipping


Injection Moulding Plastic Parts Water Flow Meter

Our Service

As a leading mechanical parts supplier in China, our producing capability is as below:

 FormingCNC, Plastic Injection Molding,cold extrusion, forged, stamping, die casting., etc
 MaterialAluminum alloy,bronze, copper, brass, steel,plastic.,etc

Surface Finish

Anodize, Sandblasting, Heat treatment, polishing, powder coating, electroplating, dacromet., etc..
 Other ProcessLaser welding, hot press, gluing.,etc
 Inspectioncolor inspection, hardness, impact, Tensile strength.,etc
FAQ
FAQQ: Can you do customized design and size?
A: Yes, ODM & OEM are available. 

Q: Can I have some samples?
A: Of course, stock samples are free.
Lead time: 2-3 days. 
Customized samples: about 7-10 days.
 

Q: How long is your production lead time?
A: The goods will be finished within 3-35 days after sample confirmed.

 

Q: What is your MOQ?
A: Our MOQ is 1-10,000pcs.

 

Q: Which payment way is workable?

A: 
Small amount: PayPal, Western Union, Cash.

Large amount: T/T, L/C, DP and OA.

 

Q: How is your after sales service?

A: 1. Your comments and feedback are important to us;

2. If any damage or defect goods you found, after necessary checking, if it's our fault,

we will take full  responsibility to compensate the loss.