China Simple Operation Building Exterior Painting Work Platform Suspension Wall Gondola Window Cleaning Cradle, Find details about China Zlp Steel Suspended Platform, Funicular Lift from Simple Operation Building Exterior Painting Work Platform Suspension Wall Gondola Window Cleaning Cradle
Simple operation Building exterior painting work platform suspension wall gondola window cleaning cradle is throught the top of suspension mechanism on the roof of buildings, hanging with wire rope along building facades, the motor assembly with two side of gondola and drive the load which inside the gondola up and down. work gondola have a stromg adaptability to construction site, it is always to be used for wall cleaning, maintenance, decoration, windows or other kind glasses cleaning, installation, maintenance or high buildings surface painting works.
We pay all our attention for the Simple operation Building exterior painting work platform suspension wall gondola window cleaning cradle, working construction cradle, hanging construction cradle, construction cradle design and manufacturing. Wall construction cradle for high buildings and windows cleaning A good tools and make work efficiently.
Technical parameters of Simple operation Building exterior painting work platform suspension wall gondola window cleaning cradle:
model | ZLP150 | ZLP500 | ZLP630 | ZLP800 | ZLP1000 |
appearance | painting/hot galvanized | ||||
fabrication material | steel/aluminum alloy | ||||
rated load | 150kg | 500kg | 630kg | 800kg | 1000kg |
lifting speed | 9-11m/min | 9-11m/min | 9-11m/min | 8-10m/min | 8-10m/min |
motor power | 1.5kw | 2x1.5kw | 2x1.5kw | 2x1.8kw | 2x2.2kw |
brake torque | 16km | 2x16km | 2x16km | 2x16km | 2x16km |
steel rope angle adjusting range | 3°-8° | 3°-8° | 3°-8° | 3°-8° | 3°-8° |
distance between two steel rope | ≤100mm | ≤100mm | ≤100m | ≤100m | ≤100m |
counter weight(optional) | 25kgx20pcs | 25kgx30pcs | 25kgx36pcs | 25kgx40pcs | 25kgx44pcs |
diameter of steel rope | 8.3mm | 8.3mm | 8.3mm | 9.1mm | 10.2mm |
max lifting height(m) | 300m | 300m | 300m | 300m | 300m |
motor rotation speed | 1420r/min | 1420r/min | 1420r/min | 1420r/min | 1420r/min |
voltage(3phases)(optional) | 220v/380v/415v/440v 50hz/60hz to be OEM |
Simple operation Building exterior painting work platform suspension wall gondola window cleaning cradle Show
Main Parts of ZLP800, ZLP1000 High building facade work Gondola Cradle Construction Swing Stage Equipment Lift Platform :
1. Platform(basket): Steel or Aluminum Alloy (painted or hot galvanized)
2. Suspension Mechanism: Steel (painted or hot galvanized)
3. Electric hoists:LTD6.3 or LTD8
4. Safety Lock: LST30
5. Electric control box: Along with hoists
6. Steel wire rope: 8.3mm ,8.6mm or 9.1mm
7. Safety rope: 18mm,20mm
8. Electric cable: 3*2.5+2*1.5
9. Counterweights: Cement , cement with steel cover & Iron counterweight
10. Spare parts
1. Suspended platform Wall gondola: Steel or Aluminum Alloy (painted or hot galvanized) | 6. Steel wire rope: 8.3mm ,8.6mm or 9.1mm |
2. Suspension Mechanism: Steel (painted or hot galvanized) | 7. Safety rope: 18mm,20mm |
3. Electric hoists:LTD6.3 or LTD8 | 8. Electric cable: 3*2.5+2*1.5 |
4. Safety Lock: LST30 | 9. Counterweights: Cement , cement with steel cover & Iron counterweight |
5. Electric control box: Along with hoists | 10. Spare parts |
Package | platform | counter weight | hoist & safety lock | control panel & other smallparts |
film | pallet | wooden case | carton box |