EPP Plastic Foam Injection Mould Tooling

China EPP Plastic Foam Injection Mould Tooling, Find details about China EPP Mould Plastic Foam Injection Mould Tooling, EPP Plastic Foam Injection Mould Tooling from EPP Plastic Foam Injection Mould Tooling

Model NO.
ZH1214
Runner
No Needed
Design Software
AutoCAD
Installation
Fixed
Certification
CE
Standard
Ce
Customized
Customized
Trademark
Zhonghui
Transport Package
Carton Box
Specification
1400x1200
Origin
China
HS Code
8480790090
Model NO.
ZH1214
Runner
No Needed
Design Software
AutoCAD
Installation
Fixed
Certification
CE
Standard
Ce
Customized
Customized
Trademark
Zhonghui
Transport Package
Carton Box
Specification
1400x1200
Origin
China
HS Code
8480790090
1.EPP Plastic Foam Injection Mould Tooling
EPP Plastic Foam Injection Mould Tooling


2.Feature of EPP Mould Plastic Foam Injection Mould Tooling
Product Description
Features of EPP/EPS/EPO mould
1) mould made of 5052 high-quality aluminum alloy
2) With a standard frame and cooling system
3) Covered with teflon to create non-stick surfaces, increase ejection ease and promote corrosion and heat resistance.
Scope of mould:
Our EPP/EPS/EPO foam moulding tools are intensively used for production of electronics packaging, technical equipment and instrument packaging, food and beverage thermal insulation packaging, transport packaging, medical equipment and devices, air conditioning structural foam parts, automotive components and interiors,
sport helmets and other protective gear, RC Hobby Model Planes, child toys, etc.
 


3.Production Flow for the Mould
EPP Plastic Foam Injection Mould Tooling


4.Final parts made by the mould:
EPP Plastic Foam Injection Mould Tooling


5.Our Advantage:
1.CE Certificate;
2.more than 20 years of experiences in mould production.
3. One-stop OEM solution services.
4. R&D team.
5. Quality control, strong production capacity and short delivery.
6. Competitive prices.
7.We are very concerned both pre-sale service and after-sale service.

6.Working Process for Mould Order
EPP Plastic Foam Injection Mould Tooling

7.Our Workshop
EPP Plastic Foam Injection Mould Tooling


8.Exhibition Show:
EPP Plastic Foam Injection Mould Tooling



9.FAQ
Q. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance. Other payment terms can also be negotiated.

Q. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q. How about your delivery time?
A: Generally, it will take 20 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q. Can you produce according to the samples?
A: Yes, we can produce mold by your samples or technical drawings.

Q. Do you test all your machines before delivery?
A: Yes, we have 100% test before delivery.

Q. Do you have some videos where we can see the line producing? 
A: Yes, we can provide some videos for reference.



10.Our location:
EPP Plastic Foam Injection Mould Tooling
Our company is near Shanghai City, about 2 and half an hour by drive. We are warmly welcome you to visit our company.
The nearest airport in our city is Nantong Xingdong International airport,which is about 40 minutes from the airport to our company.
If you come directly from your country, you could go to Shanghai Pudong International airport.We  will arrange the airport picking up for you.It is about 2 and half an hour by drive from Shanghai Pudong International airport to our city.