High Performance Factory Supply Steel Belt Pastillator and Flaker

China High Performance Factory Supply Steel Belt Pastillator and Flaker, Find details about China Steel Belt Pastillator, Steel Belt Flaker from High Performance Factory Supply Steel Belt Pastillator and Flaker

Model NO.
BHBG-10
Certification
ISO 9001
Condition
New
Application
Melted Material
Trademark
Banghua
Transport Package
Standard Package
Specification
Complete
Origin
Shandong, China
Model NO.
BHBG-10
Certification
ISO 9001
Condition
New
Application
Melted Material
Trademark
Banghua
Transport Package
Standard Package
Specification
Complete
Origin
Shandong, China

Stainless steel High Efficiency Sulfur Granulating Machine
High Performance Factory Supply Steel Belt Pastillator and FlakerHigh Performance Factory Supply Steel Belt Pastillator and FlakerHigh Performance Factory Supply Steel Belt Pastillator and FlakerHigh Performance Factory Supply Steel Belt Pastillator and FlakerHigh Performance Factory Supply Steel Belt Pastillator and Flaker

 

Description 

Banghua company, with many  years of experiences, specilize in marketing rotating steel belt cooling. we onered good reputation in the domestic and aborad. further detail information  is as followings:

Characteristics:

Adopt segmented frame, they will be assembled through screw in purchaser's factory. Adopt annulus steel belt, the steel belt will be welded in purchaser's factory. Adopt cooling water.

Working principle: It is to cool the material on steel belt and to convey.

a. The steel belt is driven by the drum at the discharge end, the drive type is worm direct-coupled type. The rotation speed is adjusted by inverter. Under the steel belt, there are 3 sections of spray cooling which spray cooling water to the back of steel belt. So the granules on steel belt will be cooled.

b. Cooling water at back of steel belt drops down and is discharged through water exit at every cooling section.

c. There is a gas outlet at the upper side of the distributor, and the waste gas produced when the material is cooling will be exhausted by fans.

d. To guarantee the steel belt's long-time and continuous work, there are 4 anti-deviation switch at the lower part of frame with alarm system which monitors the steel belt's state and also interlocks with distributor system.

High Performance Factory Supply Steel Belt Pastillator and FlakerHigh Performance Factory Supply Steel Belt Pastillator and FlakerHigh Performance Factory Supply Steel Belt Pastillator and Flaker

Steel belt (Nippon SUS301)

a. Dimension: 27140(±50)×1200(±1.0)×1.0(±0.1)mm (length×width×thickness)

Imported special steel belt, there are NBR strips at both sides of steel belt's back for avoiding belt's deviation.

b. Drum: diameter 1000mm, material: Q235, the side plate and axle are made of carbon steel.

c. Center distance of drum: 12000mm

d. effective cooling area: 12m2

e. Effective width: 1000mm

f. Steel belt speed:  0~80 m/min(adjustable)

g. The drum's transmission type is motor direct drive, motor: 5.5KW, explosion-proof level: DIPB21TAT3, protection level: IP65.

h. Material of material discharge scraper: high-density resin


High Performance Factory Supply Steel Belt Pastillator and FlakerHigh Performance Factory Supply Steel Belt Pastillator and FlakerHigh Performance Factory Supply Steel Belt Pastillator and FlakerPayment method:

50% T/T deposit before production, 50% T/T before delivery.

Delivery:

Within 30 days after receiving 50% payment in advance since signing the contract.

Machine acceptance

Pre-acceptance

Pre-acceptance is done at vendor's factory by purchaser or online video inspection.

Final acceptance

At purchaser's site and after the machine is working 72 hours, purchaser does the final acceptance and issues the acceptance report.

Acceptance criteria

a. Mechanical performance is in accordance with technical proposal and company standard;

b. Capacity: 5000kg/h

d. Final product dimension: 4-6mm(semi-ball form), conform to GB/T2449-2006

e. Granulation rate: ≥99%

f. The machine can run 72 hours with 5000kg/h.

Installation charges (exclude of the total price) and guarantee period:

a. Round-trip flight tickets for 2 engineers;

b. Service charge during the testing, 1 person 200USD/day;

c. Buyer offers accommodations for engineers freely;

d. The whole machine's guarantee period is 12 months. During this time, seller will provide accessories for buyer freely if the malfunctions are not caused by human accident. After the warranty period, seller will supply accessories for buyer with the cost prices;

e. We need around 7 days to erect and adjust the machine.

f. We need 4-5 persons from you to assist our engineers while erecting and adjusting the machine