China Manufacturer PVC Roofing Sheet Tile Making Machine Plastic Extruder Machine, Find details about China PVC Roof Panel Machine, Plastic Sheet Macking Machine from Manufacturer PVC Roofing Sheet Tile Making Machine Plastic Extruder Machine
No. | Machine | Qty. | |
1 | Screw loader for SJZ 80/156 extruder | 1set | Main tile extrusion line Ridge tile forming |
2 | SJZ 80/156 conical twin-screw extruder(PVC) | 1set | |
3 | Vacuum loader and drying hopper | 1set | |
4 | SJ50/30 single screw extruder(ASA) | 1set | |
5 | Extrusion mould and distributor | 1set | |
6 | Calibration mould and trimming device | 1set | |
7 | Haul off unit | 1set | |
8 | Cutter | 1set | |
9 | Stacker | 1set | |
10 | Ridge tile Oven | 1set | |
11 | Ridge tile Forming machine | 1set | |
12 | Screw loader for SRL-Z300/600 Mixer | 1set | Auxiliary equipment |
13 | SRL-Z300/600 Mixer unit | 1set | |
14 | PC500 Crusher | 1set | |
15 | MF550 Pulverizer | 1set | |
16 | Ridge roof forming machine(Optional) 1. Flat sheet haul-off unit 2. Oven 3. Ridge tile forming unit 4. Ridge tile mold |
Raw material & formulation | PVC powder, CaCO3, CPE, PE-WAX, Stearic acid , Compound stabilizer ,ACR, paraffin ASA granule |
Description final product & Output capacity | Two layer PVC+ASA Co-extrusion Corrugated tile(trapezoid); Width:1130mm,Thickness: 1.5~3mm; Output:300-400kg/h(Depending on CaCO3 proportion) For 2.5mm thickness, Capacity about 2300 Sqr/day |
Warehouse/Workshop | Dimension (M*M*M): 25(Length)×5(width) ×3.5 (Height) Crane: Machine positioning |
Temperature & Humidity | ≤40ºC, ≤95% |
Power supply | 3-phase, 380 V, 50 Hz(or customized) |
Wire/cables: | Wires/cables from power supply to control cabinet of this production line; |
Cooling Water hose/pipe | Water supply to machines and pools |
Lubrication oil: | Sinopec, Exxon mobile |
Compressor | 7.5kw(0.6-0.8Mpa) |
Installation power | Total 270KW,Actual consumption about 70% Suggested 200KVA transformer Needing at least 150KVA transformer |
Cooling Water | ≤20ºC, ≥0.3Mpa, ~5-6tons/hr |
Compressed air | 0.3m3/min, >0.6Mpa |
Manpower | 3 Persons/shift(24 hours need 2-3 shifts) |