Sy-V004 China Ophthalmic Equipment Digital Slit Lamp

Sy-V004 China Ophthalmic Equipment Digital Slit Lamp, Find details about China Digital Slit Lamp, Ophthalmic Slit Lamp from Sy-V004 China Ophthalmic Equipment Digital Slit Lamp

Model NO.
SY-V004
Trademark
Sunnymed
Origin
China
Model NO.
SY-V004
Trademark
Sunnymed
Origin
China
SY-V004 China ophthalmic equipment digital slit lamp

 

Specification of Slit Lamp :
 

Type                    

Parallel Galilean

Eyepiece

12.5X

Total Magnification

6X, 10X, 16X, 25X, 40X

Diameter of Visual Field

Φ37, Φ23, Φ14, Φ8.7, Φ5.7mm

Diopter Adjustment

+5D--5D

Slit Width

0mm-10mm continuously adjustable

Slit Height

1mm-10mm continuously adjustable

Aperture Diameter

Φ10, Φ8, Φ5, Φ3, Φ2, Φ1, Φ0.2mm

Slit Angle

0°-180°

Illumination Tilting

0°, 5°, 10°, 15°, 20°

Filter

Heat absorption, grey, redfree(green), cobalt blue

Input Voltage

110V/220V   60/50Hz

Input Power

60VA

Illumination Bulb

12V/50W halogen bulb

Fixation

Red LED

Picture of Slit Lamp  :
Sy-V004 China Ophthalmic Equipment Digital Slit Lamp
Sy-V004 China Ophthalmic Equipment Digital Slit Lamp

 

Other related products/Main products:

Sy-V004 China Ophthalmic Equipment Digital Slit Lamp


FAQ:

Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
 
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
 

Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
 
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The 
price will be adjusted appropriately as the price fluctuation of raw material in 
the market.
 
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about 
7-10 days to finish the production.