Water Tube 1/4" PE Food Grade Water Purifier Tube

China Water Tube 1/4" PE Food Grade Water Purifier Tube, Find details and Price about China Water Purifier Tube, Water Tube from Water Tube 1/4" PE Food Grade Water Purifier Tube

Model NO.
Tube
Usage
Water Supply Pipe
Thickness
1.05 mm
Outer Diameter
6.35 mm
Inner Diameter
4.25 mm
Temperature
-40 ~ +60ºC
Trademark
Nowro/ Customized
Transport Package
Roll/Carton
Specification
1/4"
Origin
China
HS Code
3917310000
Model NO.
Tube
Usage
Water Supply Pipe
Thickness
1.05 mm
Outer Diameter
6.35 mm
Inner Diameter
4.25 mm
Temperature
-40 ~ +60ºC
Trademark
Nowro/ Customized
Transport Package
Roll/Carton
Specification
1/4"
Origin
China
HS Code
3917310000
Product Information 
 
Product NameWater Tube 1/4" PE Food Grade Water Purifier Tube
Type1/4 inches
Product MaterialFood Grade PE
Temperature-40 ~ +60ºC
ColorWhite/Red/Blue etc.
Pressure<= 1.5 MPa
Package 600 m/roll


Product Pictures

(1) Water PE Tube use to connect Inlet and outlet of  water purifier,  RO machine and water filters etc.  
(2) Flexible water pipe and easy to install.
(3) Use vacuum forming, with the advantage of high precision, homogeneous pe tube wall, sealing Well, not easy leaking 
(4) Fit for all kinds of Water purifier RO System .




Water Tube 1/4" PE Food Grade Water Purifier TubeWater Tube 1/4" PE Food Grade Water Purifier TubeWater Tube 1/4" PE Food Grade Water Purifier TubeWater Tube 1/4" PE Food Grade Water Purifier TubeWater Tube 1/4" PE Food Grade Water Purifier TubeWater Tube 1/4" PE Food Grade Water Purifier Tube



FAQ

- Are you manufacturer?
 Yes sure, we are a manufacturer in China, which mainly produced RO membrane, membrane sheet and water purifiers etc.

- What's the MOQ?
The Mininum order quanqity is 1000 meters. If you need more, please contact us.

- OEM/ODM is acceptable?
 Yes sure. OEM & ODM services are acceptable.

- How do you ship the goods?
 For small quantity order, we usually use Express, like DHL, FedEx, UPS, TNT, etc.
 For big quantity order, by Air/ by Sea or others, all is up to you.

- What's the Lead Time?
 For small order, normally, the lead time is around 3 days
 For big order, 5-10 days for lead time.

- What are your major exporting countries and regions?
 The Middle East, Southeast Asia, West Asia, Europe and Africa, etc.