Car Preparation Station for Paiting

China Car Preparation Station for Paiting, Find details about China Prep Stations, Preparation Bay from Car Preparation Station for Paiting

Model NO.
Captain-2
Heating Mode
Diesel
Paint Mist Treatment
Dry-type
Condition
New
Basement & Floor
Without Basement ,Cement Floor
Ceiling System
Not Configure
Generator Setting
Back Exhaust Air
Intake & Exhaust Air System
3450X1100X1800 Mm (Lxwxh)
Fan
5.5kw
Filtering System
Pre-Filter Pocket,Floor Filter(Fibreglass).
Lighting System
Not Configure
Voltage Frequency
as Request
Total Power
6kw
Trademark
OEM/Captain
Transport Package
Export Container /Pallet /Disassembly with Carto
Specification
CE, SGS, ISO
Origin
Jiangsu, China.
Model NO.
Captain-2
Heating Mode
Diesel
Paint Mist Treatment
Dry-type
Condition
New
Basement & Floor
Without Basement ,Cement Floor
Ceiling System
Not Configure
Generator Setting
Back Exhaust Air
Intake & Exhaust Air System
3450X1100X1800 Mm (Lxwxh)
Fan
5.5kw
Filtering System
Pre-Filter Pocket,Floor Filter(Fibreglass).
Lighting System
Not Configure
Voltage Frequency
as Request
Total Power
6kw
Trademark
OEM/Captain
Transport Package
Export Container /Pallet /Disassembly with Carto
Specification
CE, SGS, ISO
Origin
Jiangsu, China.
Basement & FloorWithout basement ,cement floor
Ceiling SystemNot Configure
Generator SettingBack exhaust air,quadrate steel frame,blue coated steel,
Intake & Exhaust air systemGenerator dimension: 3450×1100×1800 mm (L×W×H);with 1set 5.5KW fan for exhaust air,belt-drive motor set outside;Air capacity is 16000m³/h, with electric damper to control exhaust air capacity.
Sealed TypeNot Configure
Filtering SystemPre-filter pocket,Floor filter(fibreglass).
Lighting SystemNot Configure
Control SystemControl the operation of damper working and electric damper
Voltage frequencyAs request
Total Power6KW


A. Prep stations make it possible for users to prep and perform minor paint work in one area without moving the vehicle.
B. Prep stations speed up the drying process and improve the overall quality of your finished product.
C. Two airflow choice, above ground exhaust box and pit style downdraft, allow easy integration into new or existing body shop layouts.
D. Optional heat units are available for high production needs.




Standard Prep Stations optional

L Semi-Downdraft or Pit-Style Downdraft or Full Downdraft

L With or without overhead plenum

L With or without heater & intake system

L Free-standing with structural steel support or suspended from the shop ceiling

Optional

L Cupboards in the rear of Prep Stations to store painting materials and equipments

L Roll-Up Curtains(motorized controls/manual operation)

Other features

L Overspray and dust control by 95% filter efficiency

L PHILIPS lamps, BELIMO damper and RIELLO burner

L Main electric components are CE listed

L All hardware, fasteners, sealants

L 24 months warranty

L Delivery time of standard prep station can reach 10 business days

L Bubble film packaging for sea transportation in bulk, special steel tray packages are accepted

Car Preparation Station for PaitingCar Preparation Station for PaitingCar Preparation Station for PaitingCar Preparation Station for PaitingCar Preparation Station for Paiting