China Steel Racing Mountain Bicycle 21 Speed

China Steel Racing Mountain Bicycle 21 Speed, Find details about China Bicycle, MTB Mountain Bike from China Steel Racing Mountain Bicycle 21 Speed

Model NO.
MTB-04
Frame Material
Alloy/Steel or as Requirements
Bicycle Tire
24inch 26inch 27.5inch 29inch
Mountain Bike
for Sports
Net Weight
18kg
Fork
Alloy/Steel W/Lock-out
Brake
Alloy Disc Brake
Pedals
PP,with Balls and Reflectors
Handlebar
Alloy Handlebar
Trademark
DINXAO
Transport Package
85% SKD or 35% SKD
Specification
24inch 26inch 27.5inch 29inch
Origin
China
HS Code
8712003000
Model NO.
MTB-04
Frame Material
Alloy/Steel or as Requirements
Bicycle Tire
24inch 26inch 27.5inch 29inch
Mountain Bike
for Sports
Net Weight
18kg
Fork
Alloy/Steel W/Lock-out
Brake
Alloy Disc Brake
Pedals
PP,with Balls and Reflectors
Handlebar
Alloy Handlebar
Trademark
DINXAO
Transport Package
85% SKD or 35% SKD
Specification
24inch 26inch 27.5inch 29inch
Origin
China
HS Code
8712003000
Product Description

High-Carbo Cool Sport Bicycle MTB Men Racing Mountain Bike

frame 
steel frame inner painting
Front Fork
shock absorbing fork 38 leg thickness
F&R Brake

Disc brakes YK-5 Aluminum alloy 6 screws fixed
Hub F/R 
Steel 36H
Rim
Aluminum alloy rim double wall 36H
Tire
26*2.125 air kylon tire
Speed
positioning 21 speed
Pedal
Plastic
Chain
Kmc 108L
Free Wheel
High carbon steel location
Chain Wheel
High carbon steel 24T*34T*42T
China Steel Racing Mountain Bicycle 21 SpeedChina Steel Racing Mountain Bicycle 21 SpeedChina Steel Racing Mountain Bicycle 21 SpeedChina Steel Racing Mountain Bicycle 21 Speed

 
 
After Sales Service

 

China Steel Racing Mountain Bicycle 21 Speed
1)Quality is our most important thing in entire team. The design, QA & packaging are all done in house for efficiency and to standardized a high level of quality control.
2)Warranty is 1 years under normal using(not man made damage).All of bikes and bike parts will be tested before shipping. If you received some bikes are working,  please show the pictures to us or send them back for us to repair or replace.
Our Customers

 

China Steel Racing Mountain Bicycle 21 Speed
Packaging & Shipping

China Steel Racing Mountain Bicycle 21 Speed

Delivery time

25-40 days after receiving the payment of 30% deposit.

Payment

-Irrevocable L/C at sight.
-30% T/T as deposit, balance payment after inspection while before delivery.

Packing

-One set per standard export carton.
-85% SKD and CKD.
-According to customers' request.

 

Feedback

 

We sincerely invite you to leave positive feedback to us if you are interested in our products. 

If you have any questions, please feel free to contact us at any time possible.

We will reply as soon as possible.

After Sale

Any questions of the production, please let me know directly by email or phone. 

We can deal with these issues on time, promise give you satisfied answers.

We focused on the after-sales service. Welcome send any comments to us.

 
Company Profile

China Steel Racing Mountain Bicycle 21 SpeedChina Steel Racing Mountain Bicycle 21 Speed

1)Our main products are:Road bicycle/Mountain bicycle/Folding bicycle/Childrenbicycle/City bicycle/Electric bicycle and kinds of bicycle parts and etc.
2)We have professional R&D team, and we cooperate with many brands to design and develop bicycle and bike parts.
3)The chief engineer of our R&D Department is specialized in produce bicycle for 15 years. 
4)We are able to make OEM service based quantities, so you can have unique products to different from others.
5)Customization: We offer customized service, such as customized design, customized painting, customized packing, etc. 

China Steel Racing Mountain Bicycle 21 Speed
Produce Line
We have large factories for our standardized production, as well as sixteen years of experience to run them. Our skilled workers gather together to work in our production line and assembly line. We offer them a tidy and professional working environment with bicycle components in the right place. Responsibility and safety are the two most important things throughout our production, both for our workers and our company.

 
FAQ

 

Q1. How about your delivery time?
A: Generally, it will take 15 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q2: Can I get sample and how long will it take?
Yes. We can supply sample.  And you need to pay for the sample and courier.  About 7days after receiving the payment, we will send it out.

Q3: Can I have my own customized product?
Yes. Your customized requirements for color,  logo,  design,  package,  carton mark,  your language manual etc. are very welcome.

Q4: Can I mix different models in one container?
Yes. Different models can be mixed in one container.

Q5: How does your factory carry out quality control?
We attach great importance to quality control. Every part of our products has its own QC.

Q6:Will you deliver the right goods as ordered? How can I trust you?
We will check many times before shipping. Our factory are very welcome you come to our factory for inspection and guidance.

Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

Any interesting , pls contact me directly!