Mould Closing System | |
Work Stations | 6 |
Clamping Force (kg) | 170000-230000 |
Mould-Opening Stroke (mm) | 350 |
Standard Thickness of Mould (mm) | 100-210-230 |
Mould Plate Size (mm) | 2(290*550) |
Height of Injection Nozzle (mm) | 60 |
Method of Heating | electric |
Heating Power (kw) | 8.04 |
Injection System | |
Injectors (set) | 2 |
Diameter of Screw (mm) | 60/70 |
L/D Ratio of Screw | 23 |
Max Injection Capacity (cc) | 920-1100 |
Injection Pressure | 1100 |
Injection Speed (cm/sec) | 10 |
Rotating Speed of Screw (r.p.m) | 0-190 |
Temperature Control (section) | 4 |
Electricity Consumption | |
Heater Barrel (kw) | 12.1 |
Motor for Injector Moving (kw) | 1.5 |
Heating Board of Mould (kw) | 76.8 |
Hydraulic System (kw)(50hz) | 40.5 |
Vacuum Pump (kw) | 2.2 |
Cooling Fan of Barrel (HP) | 1 |
Total Electricity (kw) | 50/70/150 |
Oil Tank Size (L) | 1000 |
Machine Weight (kg) | 23800 |
Machine size (m) | 6.5*4.5*2.8 |
Output ( Pairs/day) | 5000~8000 |
1.Its product range includes EVA slippers, sandals, clogs, mid-sole, sport protectors and various kinds of shoes and shoe accessories all depends on the EVA shoe mould and can also make EVA wheel for toys and so on.
2.The clamping force can be increased from 150 to 210 tons, according to your requirement.
3.The foam EVA injection molding machine is fully hydraulic and automatic operation except taking out product.
4.It is PLC controlled, its humanized parameter computer operation interface provide quick and exact terms of production.
Character:
1.Low operation height,Operation height in accord with human engineering
2.Extra height opening stroke
Act by fixed opening stroke: 350mm, which is not affected by any mould thickness changes and
3.available for 2plates mould,Mould thickness adjusting mechanism
Mould adjusting scope: 100-200MM
4.Rapid mould opening ,Act by toggle mechanism which opens the mould rapidly
5.Speedy injector movement
Driven by linear-track, allowing speedy moving and precise positioning,Energy saving design
6.No need water circulation for mould station
7.Space saving design,Put oil tank together with injection base, which makes the structure compact and saves more space.
FAQ.
Delivery date:
Within 20 days After receiving the 30% earnest money
Payment term:
Advance payment at order 30%, 70% before shipment
Delivery State:
Machines were taken apart and packed in suitable package that fits container shipping.
For the machine experiment and installation, our technician will be sent to your
factory. And you are requested to afford the cost of their trip and payment .
Our technician will manage all the machine things for you and at the same time train your workers on
how to use and maintain the machine.
Guarantee Time:
One-year warranty and lifelong service. During guarantee period, the cost of any spare parts or new accessory should be borne by the seller, and the freight for delivery of spare parts will be on the buyer's account.