China Amphibious Excavator Cat 320d with Undercarriage Pontoon, Find details about China Amphibious Excavator, Mphibious Pontoons Undercarriage from Amphibious Excavator Cat 320d with Undercarriage Pontoon
We UNION mainly produce 6Ton to 50Ton amphibious excavator. According to your requests, we could assemble different brands and model excavator upper parts, like PC200, HITACHI ZX210, DH215, EX120,CAT315.... Also, if you have crawler excavator (New or Used) , we can only produce amphibious undercarriage (Pontoon Undercarriage) for you. Sincerely wish could have chances to do businss with you and welcome you to visit our factory!
UNION AMPHIBIOUS EXCAVATOR COULD BE USED TO DO
1.Deepening of canal, river channel and river mouth
2.Swamp land clearing at mining area, plantation and forest
3.Building bund for flood prevention and land reclamation
4.Building bund wall for fish and shimp ponds and salt making industry
5.Sludge clearing of lakes, ponds and water reservoir
6.Digging trenches for oil and gas piping installation
7.Transporting and clearing landslide and flood hit area
8.Swamps and wetlands construction
9.Road construction through wetlands.
SPECIFICATION OF UCM320FT (CAT320D TOP PART )
Engine | |
Model | Doosan |
Type | Six-cylinder, mechanical injection, turbocharged, water cooled |
Rated power | 106.5kw |
Rated speed | 2050rpm |
Main Technical Specification | |
Operating weight | 30000kg |
Standard bucket capacity | 0.9m3 |
Slewing speed | 11rpm |
Stick digging force | 97.64KN |
Bucket digging force | 122.85KN |
Hydraulic System | |
Main pump | Kawasaki |
Main valve | Kawasaki |
Motor | Korea |
Hydraulic pressure | 32Mpa |
Traveling System | |
Traveling speed | 0~5.4Km/h |
Grade ability | 65% |
Ground pressure | 0.014Mpa |
Dimensions | |
Overall length | 11200mm |
Overall width | 5350mm |
Overall height | 3900mm |
Ground clearance | 1192mm |
Rear-end length/Slewing radius | 2801mm |
Width of pontoon | 1700mm |
Length of pontoon | 8500mm |
Height of pontoon | 1800mm |
Operating Scope | |
Stick length | 2900mm |
A: Max cutting height | 10577mm |
B: Max dumping height | 7810mm |
C: Max digging depth | 5704mm |
D: Max reach | 19900mm |
Dimensions ( UCM200FT ) | mm | |
A | Track length | 9000 |
B | Ground contact length of tracks | 5200 |
C | Tail swing radius | 2750 |
D | Overall length | 11200 |
E | Overall height (to the top of arm) | 3880 |
F | Ground clearance of counter weight | 2025 |
H | Overall width | 4940 |
I | Track gauge | 3440 |
J | Track width | 1500 |
K | Ground clearance | 1140 |
L | Track height | 1840 |
M | Overall height (to the top of cab) | 3870 |
N | Width of the top part | 2710 |
FAQ
Q: How to install ?
A: 1., a floating box landing, the two through the tube into the floating box hole, inserted in the side of the tube, a piece of wood pad, so that the lateral tilt
2. drop another pontoon and point it through two tubes
3. after the tube is inserted, the tube is fixed by the bolt
4.. Enlarge the plate to the tank and use the U card to fix it
5., the upper part of the excavator hoist, put on the market, with wide eyes on the Qi, tighten the screws
6. connect the hydraulic oil pipe, connect the oil pipe of the motor on the float box to the excavator
Q:How to operate?
A : 1., prohibit the operation of more than 1.6 meters water depth, silt is not limited to depth
2., prohibited in the uneven, the left and right sides of the floating box, the focus of great disparity in the situation, walking operations
3. amphibious excavators use slow gear while walking, and do not use fast gear
4., start the walking state, the first step on the foot of the throttle, and then walk
5. do not press hard objects while walking
6. avoid long walking on the hard surface
7. when turning, the front of the floating body can be lifted by the power of the bucket, and when the angle is shifted, the running of the chain plate can be avoided, and the derailment of the chain plate can be avoided
Q: How to maintain?
A:1. ensure the chain tension, loose situation should be adjusted to 3-5, a chain wheel suspension track shall prevail
2. ensure that the seat four screws, and ensure ten days (or work 80 hours) to beat the butter
3. top silk, beat butter once a week
Check the screws between the 4. chains and the chain, check the screws frequently and keep the screws tight