Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley

China Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley, Find details about China Iron Ore, Magnetite Processing from Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley

Model NO.
CTDG
Magnetic Pole
Permanent Magnet
Magnetic Induction Intensity
160-500 Mt
Feed Particle Size
<300mm
Diameter
500, 630, 800, 1000mm
Capacity
150-550t/H
Trademark
HZE
Transport Package
Containerized
Specification
CTDG
Origin
China
HS Code
8474100000
Model NO.
CTDG
Magnetic Pole
Permanent Magnet
Magnetic Induction Intensity
160-500 Mt
Feed Particle Size
<300mm
Diameter
500, 630, 800, 1000mm
Capacity
150-550t/H
Trademark
HZE
Transport Package
Containerized
Specification
CTDG
Origin
China
HS Code
8474100000
Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley

Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley

Working Principle
The head pulley magnet named as head pulley magnet or dry drum permanent magnetic separator also, is a self cleaning magnet which removes foreign tramp ferrous metals from bulk materials on a belt conveyor or separate the non-magnetic materials out of magnetic materials on a belt conveyor.  The magnetic field adheres magnetic materials to the belt as all materials passes over the head pulley. The magnetic materials from the underflow can be safely captured together.

Features
Large magnetic envelope angle design, magnetic envelope angle less than 180 degrees, increase the length of the separation area and the number of magnetic inversion, achieve the effective separation of magnetic materials and non (weak) magnetic materials.
Neodymium-iron-boron magnets are used in all magnetic systems to ensure high magnetic field intensity and large depth of action.
The demagnetization rate of magnetic field intensity is less than 5% after 8 years.
The magnetic system is protected by stainless steel plate to ensure that the magnetic block does not fall off.
The shell of the pulley is made of stainless steel and lined with wear-resistant rubber outside, which has a long service life.
When it is used as the driving pulley of the belt conveyor, the length of the conveyor should be less than 100 meters.
Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley



Application
It is used for dry pre-concentration of magnetite ores with size less than 300 mm before grinding. Usually it can reject some gangues to improve the iron grade before grinding.

Technical Parameters
Small and Medium Size
ModelDrum Dia.
(mm)
Drum Len.
(mm)
Belt Width
(mm)
B of Drum Surface
(mT)
Capacity
(t/h)
Feed Size
(mm)
CTDG-50/50500600500160-35050-80<50
CTDG-50/65500750650160-35060-110<50
CTDG-63/65630750650160-40070-120<50
CTDG-50/80500950800160-40070-150<50
CTDG-63/80630950800180-500100-160<150
CTDG-80/80800950800180-500120-200<150
CTDG-63/10063011501000180-500130-180<150
CTDG-80/10080011501000180-500150-260<150
CTDG-100/100100011501000180-500180-300<250

Big Size
ModelDrum Dia.
(mm)
Drum Len.
(mm)
Belt Width
(mm)
B of Drum Surface
(mT)
Capacity
(t/h)
Feed Size
(mm)
CTDG-63/12063014001200180-500150-240<150
CTDG-80/12080014001200180-500180-350<150
CTDG-100/120100014001200180-500200-400<250
CTDG-120/120120014001200180-500220-450<250
CTDG-80/14080016001400180-500240-400<250
CTDG-100/140100016001400180-500260-450<250
CTDG-120/140120016001400180-500280-500<300
CTDG-140/140140016001400180-500300-550<300

Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley


Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley
1. What is the main business scope of your company?
HZE is a company with R&D center, design institute, manufacturing factories, installation and commissioning teams. Our customers are in the mining and mineral processing fields. Our major businesses include mineral processing EPC (engineering, procurement and construction), project consultation, engineering design, mineral processing equipment manufacturing, on-site installation, commissioning, staff training, customer project operation management, spare parts supply and technical support. Customers are free to choose any one or any combination of our services.

Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley
2. What are the outstanding advantages of your company?

The one-stop service of mineral processing engineering project and equipment is our core competitiveness.
The most important feature that HZE distinguishes itself from other engineering companies, design companies or consulting companies is that we are also an equipment manufacturer with a production plant of 50,000 square meters, and we have complete manufacturing rout and the related equipment.
HZE distinguishes itself from other equipment manufacturers by owning its own R&D center and engineering design institute.
HZE distinguishes itself from many mining machinery enterprises by possessing an expert team with members including not only senior engineers of the company, but also top Chinese technical experts, university professors and researchers.

Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley
3. What are the characteristics of your company's 3D design?

HZE not only uses 3D software to design equipment, but also uses 3D software to design process flow, pipeline, steel structure, auxiliary facilities, etc. of the whole mineral processing project. We even use 3D design for equipment packaging, container packing and equipment instructions manual. This greatly improves the quality of equipment and engineering, shortens the construction period, facilitates technical discussion and evaluation, facilitates project management, improves construction safety and reduces project cost.

Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley

4.  What are the service features of your company?
  1. Customers who whether buy our equipment, or entrust us with EPC, or require us to provide a certain service, cooperate closely with us to carry out specific operations and supervise our implementation throughout the process.
  2. HZE will try to understand the basic situation and needs of customers as detailed as possible before the sale, formulate a preliminary plan according to the specific situation of customers, and get unanimous opinions after communications and discussions with customers to determine the plan.
  3. We set up customer files for every customer who signed the contract with us and upload them to the Cloud where customers can also get an account and password. Customers can have all the documents, videos and pictures, technology, services, execution, operation, management and control, maintenance and so on related to the business.
  4. Whether it is in the process of general contracting, equipment manufacturing or providing some kind of service, we welcome customers to know about our implementation on the spot or through the network, and put forward requirements and opinions.
  5. We assist users who have used our products to formulate operation specifications and make suggestions on maintenance plans and spare parts inventories. In addition to routine on-site installation, commissioning and training, during the production period after we handing over equipment to customers for use, we often understand the equipment using situations through the network and provide guidance and training to customer management and operators.
  6. For the clients who have just start the mining business, we provide the opportunity of training and practice in China's mines for the clients' employees, until they are skilled in operation and maintenance.
Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley

Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley

Iron Mining Magnetite Preconcentration Permanent Magnetic Head Pulley